alternatives required in an EIR is governed by a "rule of reason" that requires the EIR to set <br />forth only those alternatives necessary to permit a reasoned choice. <br />Additionally, CEQA Guidelines section 15126.6(a) provides that an EIR need not <br />consider alternatives that are infeasible. CEQA Guidelines section 15126.6(0(1) provide that <br />among the factors that may be taken into account when addressing the feasibility of alternative <br />are "site suitability, economic viability, availability of infrastructure, general plan consistency, <br />other plans or regulatory limitations, jurisdictional boundaries, and whether the proponent can <br />reasonably acquire, control or otherwise have access to the alternative site." <br />Where a lead agency has determined that, even after the adoption of all feasible <br />mitigation measures, a project will still cause one or more significant environmental effects that <br />cannot be substantially lessened or avoided, the agency, prior to approving the project as <br />mitigated, must first determine whether, with respect to such impacts, there remain any project <br />alternatives that are both environmentally superior and feasible within the meaning of CEQA. <br />Although an ER must evaluate this range of potentially feasible alternatives, an alternative may <br />ultimately be deemed by the lead agency to be "infeasible" if it fails to fully promote the lead <br />agency's underlying goals and objectives with respect to the project. <br />Under CEQA Guidelines section 15126.6, the alternatives to be discussed in <br />detail in an EIR should be able to "feasibly attain most of the basic objectives of the project[.]" <br />For this reason, the Project Objectives described above provided the framework for defining <br />possible alternatives. Additionally, the City must meet the objectives outlined in the 2010 <br />Settlement agreement, and the alternatives addressed in the SEIR meet those basic objectives. <br />The significant impacts of the proposed project are related to the residential <br />development needed to meet identified objectives, both for the provision of housing to meet the <br />needs of all economic segments of the community and to reduce vehicle miles travelled by <br />improving the City's jobs/housing balance. Thus, project alternatives, except the required No <br />Project Alternative, are various means of increasing local housing opportunities. <br />The City finds that that a good faith effort was made to evaluate all feasible <br />alternatives in the EIR that are reasonable alternatives to the General Plan Amendment and <br />rezoning project, and that could feasibly obtain the basic objectives of the project. As a result, <br />the scope of alternatives analyzed in the EIR is not unduly limited or narrow. The City also finds <br />that all reasonable alternatives were reviewed, analyzed, and discussed in the review process <br />of the EIR. <br />No Project Alternative <br />The No Project Alternative would result in development consistent with the City's <br />existing General Plan, and leave the City's previous Housing Element in place. That previous <br />element does not address housing needs for the current 2007-2014 planning period. State law <br />requires that the Housing Element be updated to address housing needs for all economic <br />segments of the community for the current 2007-2014 planning period. <br />Although State law requires the City to adopt a Housing Element that responds to <br />RHNA, the existing Housing element addressed in the No Project Alternative assumes buildout <br />of no more than 2,157 units under the existing Housing Element. This includes the 319 housing <br />units constructed between 2007 and 2010, 82 units currently under construction, 1,321 units <br />with approvals, 158 potential units on residentially zoned land, and 870 that could be