My WebLink
|
Help
|
About
|
Sign Out
3_Exhibit C
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2023
>
02-22
>
3_Exhibit C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2023 1:30:15 PM
Creation date
2/16/2023 1:15:47 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/22/2023
DESTRUCT DATE
15Y
Document Relationships
3
(Message)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2023\02-22
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1857
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6 Mitlgellon monitoring and Reporting Program <br />TABLE 6-1(Continued) <br />MITIGATION MONITORING AND REPORTING PROGRAM <br />Site(s)Implementation Monitoring Monitoring and Reporting Monitoring Verification of <br />Mitigation Measures Affected Procedures Responsibility Action Schedule • Compliance <br />accordance Mtn the procedures and requirements set Myth in The project applicant will verification. Inspect site during on construction Dare: <br />Calilonia Health and Safety Code Section 7050.5 and Public halt want and notify the constriction to ensure <br />drawings. <br />Resources Section 509198.These code provisions require County Coroner,if compliance with project <br />notification of the County Carver and the Native American Field inspections <br />necessary.If appropriate, construction plans.duringHeritageCmelydescended <br />mwhoht must notify the persons believed Coroner shall notify NAHC. construction.to be most likely descended from the deceased Native American for NAHC shall notify Most <br />appropriate c isposibon of the remains. Likely Descendant. <br />This measure will be panted <br />on all construction <br />documents,contracts,and <br />project plans. <br />G.Hazards aad Hazardous Materials <br />Mitigation Measure 4.G-2:The City shell ensure that each i Al Project appicant will prepare Community Review of Phase 1 and if Prior to issuance Verified by: <br />project applicant retain a qualified environmental consulting firm a Phase!environmental Development remediatlon is required, of construction <br />to prepare a Phase I environmental site assessment in assessment to ensure which <br />i <br />Department review verification. and grading I <br />accordance with ASTM E1527-05 which would ensure that the adheres to all specifications permit(s).Dare: <br />City Is aware of any hazardous materials on the site and can in this measure, whichever is <br />require the right wane of action.The Phase I shall determine <br />if the Phase 1 determinesthepresenceofrecognizedenvironmentalconditionsand <br />provide recommendations for further Investigation.if applicable. that Fuller investigation and <br />Prior to receiving a building or grading permit.project applicant rerediation is needed,the <br />shall provide documentation from overseeing agency(e.g., <br />project applicant will provide <br />ACEM or RWOCB)that sites with identified contamination have verification from overseeing <br />been remediated to levels where no threat to human health or agency that sites with <br />the environment remains for the proposed uses. I identified contamination <br />have been reme0iated to <br />levels where no threat to I <br />human health or the <br />environment remains for the <br />proposed uses. <br />Mitigation Measure 4.G-S: a.8.8. Project applicant cog submit Community Verify information Verity and Verified by <br />a. Prior to PUD approval for Sites 11(lGawa),14(Legacy <br />10,11, information which Development submitted.Forward forward prior to <br />Partners).B(approval for Site,8( <br />1 0 <br />de Mau4(iegecyxk).10 <br />14,16, demonstrates compliance Department—information to ALUC. PUD approval or <br />17,21 with ALUPP. verification and use permit <br />CarrA erin),18(Vintage Hills Shopping Center).17(Ave i forwarding of approval as <br />Dare: <br />Community Heath),and 21(4202 Stanley):1)the aajeCt information applicable. <br />appti®nt shall submit information to the Director of Community I Require condition <br />when <br />compliance with the ALUPP,as i b.11 and Forward information to Include condition— when PUD is <br />apptcade,including its height guidance;and 2)the Director of . <br />t4 ALUC as described.City of Pleasanton <br />reviewed. • <br />Comnamty Development shall forward this information and the i c.All Include conditions as City Council. <br />aoposed PUD development plan to the ALUC for review.described. <br />D. Pnorto- use p-, ice Saes 11 Jewel and 14 <br />Camel Pte/amendment and Reams 6-10 ESA:210015 <br />Feel Supplemental Environmental ier'.d Report Detente(2011
The URL can be used to link to this page
Your browser does not support the video tag.