Laserfiche WebLink
t.Mitigation Monitoring and Reporting Program <br />TABLE&t(Continued) <br />MITIGATION MONITORING AND REPORTING PROGRAM <br />Sitats) Implementation Monitoring Monitoring and Reporting Monitoring Verification of <br />Mitigation Measures Affected Procedures Responsibility Action Schedule Compliance <br />plans. <br />Field inspections <br />during <br />constNCbon. <br />Mitigation Manure 4.J-5a:Prior to PUD approval.is potential All Project applicant wilt Community Community Development Prior to PUD •Verified by <br />site for rezoning would add traffic noise in excess of 55 dBA as prepare an acoustical Development Department-Review and approval- <br />descdbed in Table 4 Jb.the project applicant shall conduct an assessment that adheres to Department approve acoustical Approval of ' <br />off-site noise study to determine the project's contribution to off- all specifications of this consultant,review and consultant. 'Dale: <br />site roadway noise and contribute Its fair-share to mitigate the measure. approve acoustical assessment, <br />established noise impact.City of Pleasanton assessment,and collection noise reduction <br />Projectte fair-share <br />will <br />City Council of payment, concept,and <br />contribute tali-share to contribution <br />mitigate identified noise City of Pleasanton City amount. <br />impacts. Council-Review and <br />approval of concept to <br />reduce noise level(e.g., Prior to approval <br />repaving with noise <br />of buildingattenuatingpavement)so <br />that fair share contribution permits- <br />can be assessed.Approve Payment • <br />contribution amount. <br />Mitigation Measure 44-5b:My residential or office buildings All Project applicant will Community Review and approval Prior to approval Verified by' <br />that be built to California's interior-noise insulation standard so prepare an acoustical Development acoustical consultant. of building , <br />that interior traffic noise exposure does not exceed 45 dB Ldn. assessment that adheres to Department Review and approve permits. <br />Before building permits are issued,the project applicant shall be all specifications of this acoustical assessment and Date: <br />required to submit an acoustical analysis demonstrating that the measure. design plans. <br />buildings have been designed to limit interior traffic noise <br />If noise thresholds are <br />Field inspections <br />exposure to a level of 45 dB LtlNCNEL or lave. <br />exceeded,reasonable and during <br />feasible mitigation will be <br />Inspect site during construction. <br />required to reduce levels to <br />construction to ensure <br />City standards, <br />compliance with project <br />constructon plane. <br />Mitigation Measure 4.J-5e:Any locations of outdoor activity for All Project applicant will Community Community Development Community Verified by: <br />sensitive uses associated with the project site shall be designed i prepare an acoustical Development Department-Review and Development <br />so that the noise exposure from traffic does not exceed 85 dB assessment and prepare Department approve acoustical Department to <br />Lin at these activity areas.This shall be done thru site site designs that adhere to consultant and assessment. approve Date: <br />orientation(i.e.,location of activity areas away from roadways or all specifications of this Verify inclusion of approved consultant and <br />i3GeneralMMxnenenerentReeIa <br />ESA r 112011 <br />rnW svpu.n.am EnnmrinwnW intre awn o..w.1w mtt