Laserfiche WebLink
<br />CalEEMod Version: CalEEMod.2020.4.0 <br /> <br /> <br />Page 1 of 39 <br /> <br /> <br />Date: 12/6/2022 12:04 PM <br /> <br /> <br /> <br />Pleasanton Stoneridge Mall Residential - Alameda County, Annual <br /> <br /> <br /> <br />EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Not Applied <br /> <br /> <br /> <br />Pleasanton Stoneridge Mall Residential <br /> <br /> <br /> <br />Alameda County, Annual <br /> <br /> <br /> <br /> <br />1.0 Project Characteristics <br /> <br /> <br /> <br /> <br />1.1 Land Usage <br /> <br /> <br /> <br /> <br />Land Uses Size Metric Lot Acreage Floor Surface Area Population <br />Other Non-Asphalt Surfaces 2.04 Acre 2.04 88,738.00 0 <br />Unenclosed Parking with Elevator 473.00 Space 0.84 182,650.00 0 <br />City Park 1.39 Acre 1.39 60,334.00 0 <br />Recreational Swimming Pool 2.00 1000sqft 0.05 2,000.00 0 <br />Apartments Mid Rise 360.00 Dwelling Unit 2.04 448,560.00 1030 <br /> <br /> <br /> <br /> <br /> <br /> <br />1.2 Other Project Characteristics <br /> <br /> <br /> <br /> <br />Urbanization <br /> <br /> <br />Urban <br /> <br /> <br />Wind Speed (m/s) <br /> <br />2.2 <br /> <br /> <br />Precipitation Freq (Days) <br /> <br /> <br />63 <br /> <br /> <br /> <br />Climate Zone <br /> <br /> <br />4 <br /> <br /> <br />Operational Year <br /> <br /> <br />2025 <br /> <br /> <br /> <br /> <br />Utility Company <br /> <br /> <br />Pacific Gas and Electric Company <br /> <br /> <br /> <br /> <br />CO2 Intensity <br />(lb/MWhr) <br /> <br /> <br />203.98 <br /> <br /> <br />CH4 Intensity <br />(lb/MWhr) <br /> <br /> <br />0.033 <br /> <br /> <br />N2O Intensity <br />(lb/MWhr) <br /> <br />0.004 <br /> <br /> <br /> <br /> <br />1.3 User Entered Comments & Non-Default Data <br /> <br /> <br /> <br /> <br />Project Characteristics - This model includes both construction and operation of the proposed project. <br /> <br />Land Use - Based on site plan and applicant provided information, the main site and frontage area add up to 6.36 acres. <br /> <br />Construction Phase - Applicant indicates that construction schedule starts in June 2023 and ends in October 2025. The default schedule is adjusted to reflect <br />the construction duration. <br /> <br />Demolition - Based on applicant, 239,773 square feet of asphalt were to be removed. Please see demolition calculation for details. <br /> <br />Grading - Based on earthwork estimation from site plan, 22,980 cube yards of fill will be needed. <br /> <br />Architectural Coating - Project applicant indicated that low VOC paint (50 g/L or less) will be applied during the construction phase. <br /> <br />Vehicle Trips - Based on the traffic study, 4.75 trips per dwelling unit is used for the proposed land use. <br /> <br />Woodstoves - No woodstove nor wood fireplaces would be built within the proposed project. <br /> <br /> <br /> <br />Appendix B Page 3