My WebLink
|
Help
|
About
|
Sign Out
3_Exhibit C
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2023
>
02-22
>
3_Exhibit C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2023 1:30:15 PM
Creation date
2/16/2023 1:15:47 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/22/2023
DESTRUCT DATE
15Y
Document Relationships
3
(Message)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2023\02-22
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1857
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Pleasanton Stoneridge Mall Residential Project Energy Use Summary <br />Summary of Energy Use During Construction <br />Construction vehicle fuel 105,139 gallons (gasoline, diesel) <br />Construction equipment fuel 31,387 gallons (diesel) <br />Total construction fuel 136,525 gallons (gasoline, diesel) <br />Construction office electricity 28,822 kilowatt hours <br />Summary of Energy Use During Operations (Annually) <br />Operation vehicle fuel 153,480 gallons (gasoline, diesel) <br />Operation natural gas 0 kilo-British Thermal Units <br />Operation electricity 1,746,251 kilowatt hours <br />Appendix B Page 50
The URL can be used to link to this page
Your browser does not support the video tag.