My WebLink
|
Help
|
About
|
Sign Out
13
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
032123
>
13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2023 9:01:39 AM
Creation date
3/16/2023 8:39:31 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/21/2023
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
894
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />5 <br />ROW <br /># <br />STANDARDS AND GUIDELINES COMPLIANCE NOTES <br /> Compliant Flex / Waiver Incentive Not Applicable <br />their primary circulation and addressing of the units <br />and building orientation. <br />12. A1.b Alleys and parking areas should not be used for <br />primary circulation to the building entries and through <br />the site. Where possible, primary entries should orient <br />to public streets, internal streets, and paseos/open <br />spaces. <br />X <br />The alleys provide perimeter access to the <br />garages and parking per row 28 below. <br />13. A1.c Pedestrian walkways should be separate and <br />distinct from parking areas and drive aisles and include <br />landscaping/trees, lighting and decorative paving at <br />crossings. <br />X <br /> <br />14. A1.d Streets, alleys and paseos should not only connect <br />internally but also be publicly accessible and connect to <br />adjacent streets and neighboring development. X <br />The internal alleys along the north and west <br />edges of the development include walkways that <br />connect pedestrians and vehicles to the public <br />streets and to the rest of the Stoneridge Mall. <br />15. A1.e Anticipate future connections to adjacent parcels <br />to provide future connectivity. X <br />Sidewalks have been located along both the <br />north and west sides of the development which <br />face the Stoneridge Mall and are expected to <br />connect to future mall redevelopment. <br />16. A1.f Pedestrian and bike paths should be used where <br />street connections to adjacent neighborhoods are <br />infeasible. <br />X <br />Pedestrian walkways have been provided to <br />connect this development to the public right-of- <br />way and the Stoneridge Mall.
The URL can be used to link to this page
Your browser does not support the video tag.