My WebLink
|
Help
|
About
|
Sign Out
RES 231376 Exhibit A - Addendum and Mitigation Monitoring and Reporting Plan (MMRP)
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2023
>
RES 231376 Exhibit A - Addendum and Mitigation Monitoring and Reporting Plan (MMRP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2023 9:05:52 AM
Creation date
4/5/2023 8:52:16 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/21/2023
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1857
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton—Stoneridge Mall Residential Project <br />Section 15183 Checklist/15164 Addendum CEQA Checklist <br /> <br /> <br />FirstCarbon Solutions 115 <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480017/Consistency Checklist/21480017 Stoneridge Mall Residential Project Checklist <br />Addendum_Updated.docx <br />Environmental Issue <br />Area <br />Conclusion in <br />Prior EIR <br />Are there <br />Project <br />Impacts <br />Described in <br />15183? <br />Are there <br />Proposed <br />Changes <br />Involving <br />New or More <br />Severe <br />Impacts? <br />(15162) <br />Are there <br />New <br />Circumstances <br />Involving New <br />or More <br />Severe <br />Impacts? <br />(15162) <br />Is there New <br />Information <br />Involving New <br />or More <br />Severe <br />Impacts? <br />(15162) <br />Mitigation <br />Measures <br />roads, fuel breaks, <br />emergency water <br />sources, power liens <br />or other utilities) that <br />may exacerbate fire <br />risk or that may result <br />in temporary or <br />ongoing impacts to <br />the environment? <br />Prior EIR was <br />certified <br />j) Expose people or <br />structures to <br />significant risks, <br />including downslope <br />or downstream <br />flooding or landslides, <br />as a result of runoff, <br />post-fire slope <br />instability, or drainage <br />changes? <br />This checklist <br />question did <br />not exist at <br />the time the <br />Prior EIR was <br />certified <br />No No No No None <br /> <br />Environmental Setting <br />A Phase I Environmental Site Assessment (Phase I ESA) was prepared for the project site by APEX <br />Companies (Appendix F).53 <br />The project site and its surroundings remained undeveloped up to approximately 1930. The project <br />site and surrounding areas were used for agriculture from at least the 1930s to the late 1970s, when <br />the project site was developed for its current use as an asphalt parking lot as part of the Stoneridge <br />Mall. <br />Findings <br />a) Transport, Use, or Disposal of Hazardous Materials <br />Prior EIR Conclusions <br />The Prior EIR determined that future potential projects may transport and use hazardous materials <br />such as fuel or solvents during construction and demolition activities, which could accidentally spill <br />into the environment, creating hazardous conditions that could degrade groundwater quality or <br /> <br />53 Apex. 2022. Phase I Environmental Site Assessment. January 12.
The URL can be used to link to this page
Your browser does not support the video tag.