Laserfiche WebLink
City of Pleasanton—Stoneridge Mall Residential Project <br />Section 15183 Checklist/15164 Addendum Mitigation Monitoring and Reporting Program <br /> <br /> <br />FirstCarbon Solutions 6 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480017/MMRP/21480017 Stoneridge Mall Residential Project MMRP (002)_Updated.docx <br />Mitigation Measures Method of Verification Timing of Verification <br />Responsible for <br />Verification <br />Verification of Completion <br />Date Initial <br />the Lead Agency. Excavation or disturbance may continue in <br />other areas of the site that are not reasonably suspected to <br />overlie adjacent or additional paleontological resources. <br />Department, <br />Planning Division <br />Prior EIR MM 4.D-3: In the event that paleontological <br />resources are encountered during the course of development, <br />all construction activity must temporarily cease in the affected <br />area(s) until the uncovered fossils are properly assessed by a <br />qualified Paleontologist and subsequent recommendations for <br />appropriate documentation and conservation are evaluated by <br />the Lead Agency. Excavation or disturbance may continue in <br />other areas of the site that are not reasonably suspected to <br />overlie adjacent or additional paleontological resources. <br />Halting of excavation <br />and/or disturbance; <br />Retention of a qualified <br />Paleontologist. <br />Upon discovery of <br />paleontological <br />resources <br />Qualified <br />Paleontologist; City <br />of Pleasanton <br />Community <br />Development <br />Department, <br />Planning Division <br /> <br />Implementation Measure 2: The project applicant shall hire a <br />qualified geotechnical firm to conduct a design-level <br />geotechnical study. The design-level study shall incorporate <br />further recommendations that will reduce impacts resulting <br />from expansive soils to the greatest extent possible. Prior to <br />issuance of preliminary grading permits, the project applicant <br />shall incorporate all recommendations provided in the design- <br />level geotechnical study into the project plans. <br />Submittal of design-level <br />geotechnical study; <br />submittal of project plans <br />that incorporate <br />recommendations <br />Prior to issuance of <br />preliminary grading <br />permits <br />City of Pleasanton <br />Community <br />Development <br />Department, <br />Planning Division <br /> <br />Implementation Measure 3: The project applicant shall obtain <br />a qualified Paleontologist to monitor all ground-disturbing <br />activities in previously undisturbed areas at the project site. <br />Procedures for handling potential paleontological resources <br />encountered are included in Prior EIR MM 3. <br />Retention of qualified <br />Paleontologist <br />During ground- <br />disturbing activities <br />City of Pleasanton <br />Community <br />Development <br />Department, <br />Planning Division; <br />Qualified <br />paleontological <br />monitor <br /> <br />X. Hydrology and Water Quality <br />Prior EIR MM 4.L-2: Prior to the recordation of a Final Map, the <br />issuance of a grading permit, the issuance of a building permit, <br />or utility extension approval to the site, whichever is sooner, <br />Submittal of written <br />verification from Zone 7 <br />Water Agency or City of <br />Prior to the <br />recordation of a Final <br />Map, the issuance of <br />City of Pleasanton <br />Community <br />Development <br />