My WebLink
|
Help
|
About
|
Sign Out
RES 231376 Exhibit A - Addendum and Mitigation Monitoring and Reporting Plan (MMRP)
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2023
>
RES 231376 Exhibit A - Addendum and Mitigation Monitoring and Reporting Plan (MMRP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2023 9:05:52 AM
Creation date
4/5/2023 8:52:16 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/21/2023
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1857
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton—Stoneridge Mall Residential Project <br />Section 15183 Checklist/15164 Addendum Mitigation Monitoring and Reporting Program <br /> <br /> <br />FirstCarbon Solutions 10 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480017/MMRP/21480017 Stoneridge Mall Residential Project MMRP (002)_Updated.docx <br />Mitigation Measures Method of Verification Timing of Verification <br />Responsible for <br />Verification <br />Verification of Completion <br />Date Initial <br />1. Foothill Road north of Canyon Way (project’s share is 1.65 <br />percent) <br />2. Foothill Road south of Canyon Way (project’s share is 0.81 <br />percent) <br />3. Canyon Way east of Foothill Road (project’s share is 2.16 <br />percent) <br />4. Springdale Avenue north of Stoneridge Drive (project’s share <br />is 0.33 percent) <br />5. Springdale Avenue east of Springdale Avenue (project’s <br />share is 0.15 percent) <br />6. Stoneridge Mall Road north of Stoneridge Drive (project’s <br />share is 3.42 percent) <br />7. Stoneridge Drive east of Stoneridge Mall Road (project’s <br />share is 1.69 percent) <br />8. Stoneridge Drive west of Stoneridge Mall Road (project’s <br />share is 0.15 percent) <br />Implementation Measure 2 Traffic Noise Exceedance <br />Reduction Measure <br />Prior EIR MM 4.J-5c. shall be implemented as follows: the <br />project shall include construction of a barrier along the north <br />and east sides of the northeastern level 4 rooftop deck. The <br />barriers should run the length of the east and north edges of <br />the rooftop deck, be at least 6 feet high, have a minimum <br />surface weight of 3 pounds per square foot, and have no cracks <br />or gaps. Glass or another transparent material can be used. <br />With the barrier in place, traffic noise levels would be reduced <br />to below 65 dBA Ldn at the northeast rooftop deck Level 4. <br />Incorporation into project <br />plans <br />Prior to issuance of <br />building permit. <br />City of Pleasanton <br />Community <br />Development <br />Department, <br />Planning Division <br /> <br />XVII. Transportation <br />Prior EIR MM 4.N-7: The City shall require developers on the <br />potential sites for rezoning to contribute fair-share funds <br />through the payment of the City of Pleasanton and Tri-Valley <br />Regional traffic impact fees to help fund future improvements <br />to local and regional roadways. <br />Payment of City of <br />Pleasanton and Tri-Valley <br />Regional traffic impact <br />fees. <br />Prior to the issuance <br />of building permit. <br />City of Pleasanton <br />Community <br />Development <br />Department, Traffic <br />Engineering Division <br />
The URL can be used to link to this page
Your browser does not support the video tag.