Laserfiche WebLink
Indoor Air Quality - In accordance with the recommendations of BAAQMD, <br />appropriate measures shall be incorporated into building design in order to <br />reduce the potential health risk due to exposure of sensitive receptors to TACs to <br />a less than significant level. <br />Project applicants shall retain a qualified air quality consultant to prepare a health <br />risk assessment (HRA) in accordance with the BAAQMD requirements to <br />determine the exposure of project residents/occupants/users to air pollutants <br />prior to PUD approval. The HRA shall be submitted to the Community <br />Development Department for review and approval. The applicant shall implement <br />the approved HRA mitigation measure recommendations, if any, in order to <br />reduce exposure to TACs below BAAQMDs threshold of significance at the time <br />of project approval. <br />Outdoor Air Quality - To the maximum extent practicable, individual and common <br />exterior open space, including playgrounds, patios, and decks, shall either be <br />shielded from the source of air pollution by buildings or otherwise buffered to <br />further reduce air pollution for project occupants. <br />Site(s) affected: All <br />Draft SEIR, pp. 4.B-21 to 4.8-24; Final SEIR, pp. 2-4 to 2-5.) <br />Impact 4.B-5 <br />Development facilitated by the proposed General Plan Amendment and <br />rezonings could potentially include residential developments that expose occupants to sources <br />of substantial odors affecting a substantial number of people. <br />The SEIR evaluates the impact of the proposed project related to the exposure of <br />residents to substantial odors. Existing odor sources in the City of Pleasanton include: (1) sand- <br />and-gravel harvesting areas — including asphalt plants — along Stanley Boulevard; (2) the <br />Dublin-San Ramon Services District sewage treatment plant on Johnson Drive and the <br />treatment ponds and drying beds north of Stoneridge Drive; and (3) the solid waste transfer <br />station on Busch Road. <br />Significance Before Mitigation: Significant <br />Significance After Mitigation: Less than Significant <br />Finding: Changes or alterations have been required in or incorporated into the <br />Project that would avoid or substantially lessen the significant environmental <br />effect as identified in the SEIR. Mitigation Measure 4.B-5, which has been <br />required in or incorporated into the Project, will reduce the significant <br />environmental impact to a less than significant level. <br />Facts in Support of Finding: The following facts and mitigation measure indicate <br />that the impact will be reduced to less than significant.