My WebLink
|
Help
|
About
|
Sign Out
RES 231376 Exhibit A - Addendum and Mitigation Monitoring and Reporting Plan (MMRP)
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2023
>
RES 231376 Exhibit A - Addendum and Mitigation Monitoring and Reporting Plan (MMRP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2023 9:05:52 AM
Creation date
4/5/2023 8:52:16 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/21/2023
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1857
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
required in or incorporated into the Project, will reduce the significant <br />environmental impact to a less than significant level. <br />Facts in Support of Finding: The following facts and mitigation measures indicate <br />that the impact will be reduced to less than significant. <br />1.Subsurface ground-disturbing activities of the proposed <br />project could have a significant impact on previously unknown unique <br />paleontological resources in the Planning Area. <br />2.Implementation of Mitigation Measure 4.D-3 set forth in <br />Table 6-1 of the Final SEIR and listed in the MMRP will ensure that Impact 4.D-3 <br />would be reduced to a less than significant level and is hereby incorporated by <br />reference and described below: <br />4.D-3: In the event that paleontological resources are encountered during the <br />course of development, all construction activity must temporarily cease in the <br />affected area(s) until the uncovered fossils are properly assessed by a qualified <br />paleontologist and subsequent recommendations for appropriate documentation <br />and conservation are evaluated by the Lead Agency. Excavation or disturbance <br />may continue in other areas of the site that are not reasonably suspected to <br />overlie adjacent or additional paleontological resources. <br />Site(s) affected: All <br />Draft SEIR, p. 4.D-18.) <br />Impact 4.D-4 <br />Development facilitated by the General Plan Amendment and rezonings has the <br />potential to disturb human remains, including those interred outside of formal cemeteries. <br />The SEIR evaluates the impacts of the proposed project related to the <br />disturbance of human remains, including those interred outside of formal cemeteries. <br />Significance Before Mitigation: Significant <br />Significance After Mitigation: Less than Significant <br />Finding: Changes or alterations have been required in or incorporated into the <br />Project that would avoid or substantially lessen the significant environmental <br />effect as identified in the SEIR. Mitigation Measure 4.D-4, which has been <br />required in or incorporated into the Project, will reduce the significant <br />environmental impact to a less than significant level. <br />Facts in Support of Finding: The following facts and mitigation measures indicate <br />that the impact will be reduced to less than significant. <br />1.Subsurface ground-disturbing activities of the proposed <br />project could inadvertently disturb previously unknown human remains.
The URL can be used to link to this page
Your browser does not support the video tag.