Laserfiche WebLink
t M ligallion Monitonng and Reporting Program <br />TABLE 8-1(Continued) <br />MITIGATION MONITORING AND REPORTING PROGRAM <br />Site(*) Implementation Monitoring Monitoring and Reporting Monitoring Verification of <br />Mitigation Measures Affected Procedures Responsibility Action Schedule I Compliance <br />shielded by project buildings)or with the inclusion of appropriate measure.City of Pleasanton site orientation and/or noise approve <br />noise barriers.Prior to PUO approval,the project applicant shall I I City Council barriers on construction assessment prior <br />be required to submit an acoustical analysis demonstrating that i plans.Inspect site during to PUD approval <br />outdoor activity spaces associated with sensitive uses do not i I construction to ensure Verify approved <br />exceed 65 d8 Ldn within these spaces.compliance with project site orientation <br />construction plans.and noise barrier <br />measures on <br />City Council-Review and construction lane: <br />approve site orientation prior to issuance l <br />and/or noise banters, of a building <br />permit. <br />Inspect site <br />during <br />construction to <br />ensurecompliance with i <br />projectconstruction <br />plans. <br />City Council• <br />Prior to PUD <br />approval <br />Mitgation Measure 4.J4a:For all of the potential sites for All Project applicant will Community Review and approve Prior to approval ,Verified by: <br />reaming the City shall require site-specific acoustical prepare an acoustical Development acoustical assessment and of building <br />assessments to determine noise exposure,impact,and assessment that adheres to I Department design plans. permits. <br />mitigation regarding non-transportation sources.Noise exposure all specification's of this I Dent: <br />shall be mitigated to satisfy the applicable City Code criterion measure. Inspect site during Field inspections <br />using appropriate housing site design. construction to ensure during <br />If noise thresholds are compliance with project construction. I <br />exceeded,reasonable and construction plans. <br />feasible mitigation will be I <br />required to reduce levels to <br />City standards. <br />Mitigation Measure 4.J-0b:For Site 14 the City shall require a 14 Project applicant will Community Community Development Exterior Verified by: <br />site-specific acoustical assessment to determine noise from prepare an acoustical Development Department-Review and measures prior to , <br />quarrying noise sources.Recommendations in the acoustical assessment that adheres to Department approve acoustical PUD approval. <br />assessment shell be sufficient to satisfy the applicable City of all specifications of this consultant.Review and Dare: <br />Pleasanton 70 dB Ldn and 50/55 dB Lmas exterior and interior measure.City of Pleasanton a Interior measures <br />noise exposure criteria,respectively.City Council assessment.Review and Prior to approval <br />If noise thresholds are approval of interior of building <br />exceeded,reasonable and <br />measures. permits. <br />feasible mitigation will be <br />required to reduce levels to City of Pleasanton City Field inspections j <br />Gerona Man Mwntlmwi W Razm.es 6-14 ESA/210010 <br />r-+4l aupilenera erinm nentS im• Rests December Mil