My WebLink
|
Help
|
About
|
Sign Out
RES 231376 Exhibit A - Addendum and Mitigation Monitoring and Reporting Plan (MMRP)
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2023
>
RES 231376 Exhibit A - Addendum and Mitigation Monitoring and Reporting Plan (MMRP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2023 9:05:52 AM
Creation date
4/5/2023 8:52:16 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/21/2023
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1857
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pleasanton Stoneridge Mall Residential Project CalEEMod Notes <br />Project Characteristics - This model includes both construction and operation of the proposed project. <br />Land Use - Based on site plan and applicant provided information, the main site and frontage area add <br />up to 6.36 acres. Main Assumptions include: <br />•Multi-Family Building Footprint = Level 1 square footage + Level 1 amenity <br />•Multi-Family Building Square Footage = All level square footage + all level amenity <br />•Paved Surfaces (Non-Asphalt) includes courtyards, balconies, and streetside plaza subtracting <br />the amount of landscaping <br />•All other land uses (parking structure, swimming pool, landscaping) are referenced based on site <br />plan and applicant provided information. <br />Construction Phase - Applicant indicates that construction schedule starts in June 2023 and ends in <br />October 2025. The default schedule is adjusted to reflect the construction duration. <br />Demolition - Based on applicant, 239,773 square feet of asphalt were to be removed. Please see <br />demolition calculation for details. <br />Grading - Based on earthwork estimation from site plan, 22,980 cube yards of fill will be needed. <br />Architectural Coating - Project applicant indicated that low VOC paint (50 g/L or less) will be applied <br />during the construction phase. For operational architectural coating, the 100 g/L VOC paint is applied for <br />conservative estimate. <br />Vehicle Trips - Based on the traffic study, 4.75 trips per dwelling unit is used for the proposed land use. <br />Woodstoves - No woodstove nor wood fireplaces would be built within the proposed project. <br />Energy Use - Based on information received from the project applicant, the proposed project would be <br />all-electric. <br />Construction Off-road Equipment Mitigation - BAAQMD Best Management Practices. <br />Appendix B Page 1
The URL can be used to link to this page
Your browser does not support the video tag.