My WebLink
|
Help
|
About
|
Sign Out
RES 231376 Exhibit A - Addendum and Mitigation Monitoring and Reporting Plan (MMRP)
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2023
>
RES 231376 Exhibit A - Addendum and Mitigation Monitoring and Reporting Plan (MMRP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2023 9:05:52 AM
Creation date
4/5/2023 8:52:16 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/21/2023
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1857
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton—Stoneridge Mall Residential Project <br />CEQA Checklist Section 15183 Checklist/15164 Addendum <br /> <br /> <br />90 FirstCarbon Solutions <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480017/Consistency Checklist/21480017 Stoneridge Mall Residential Project Checklist <br />Addendum_Updated.docx <br />Environmental Issue <br />Area <br />Conclusion <br />in Prior EIR <br />Are there <br />Project <br />Impacts <br />Described in <br />15183? <br />Are there <br />Proposed <br />Changes <br />Involving New <br />or More <br />Severe <br />Impacts? <br />(15162) <br />Are there New <br />Circumstances <br />Involving New <br />or More <br />Severe <br />Impacts? <br />(15162) <br />Is there New <br />Information <br />Involving New <br />or More <br />Severe <br />Impacts? <br />(15162) <br />Mitigation <br />Measures <br />VI. Energy <br />Would the project: <br />a) Result in <br />potentially <br />significant <br />environmental <br />impact due to <br />wasteful, <br />inefficient, or <br />unnecessary <br />consumption of <br />energy resources, <br />during project <br />construction or <br />operation? <br />LTS No NA NA NA None <br />b) Conflict with or <br />obstruct a State or <br />local plan for <br />renewable energy <br />or energy <br />efficiency? <br />LTS No NA NA NA None <br /> <br />Discussion <br />a) Wasteful, Inefficient, or Unnecessary Consumption of Energy Resources <br />Prior EIR Conclusions <br />The Prior EIR determined that development would not encourage the wasteful or inefficient use of <br />energy. <br />Analysis of Proposed Project <br />The implementation of the proposed project would utilize energy resources during construction and <br />operational activities. Energy resources that would be potentially impacted include electricity and <br />petroleum-based fuel supplies and distribution systems. The energy consumption is analyzed in the <br />following section. <br />The types of on-site equipment used during construction of the proposed project could include <br />gasoline-and-diesel-powered construction and transportation equipment, including trucks,
The URL can be used to link to this page
Your browser does not support the video tag.