My WebLink
|
Help
|
About
|
Sign Out
SUMMERHILL (ANDARES) MAINTENANCE WATER METERS
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
S
>
SUMMERHILL (ANDARES) MAINTENANCE WATER METERS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2023 11:32:23 AM
Creation date
4/13/2023 11:32:00 AM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
12/14/2015
LONG TERM AGREEMENTS - NAME
MAINTENANCE AGREEMENT WATER METERS
LONG TERM AGREEMENTS - TYPE
WATER SERVICES AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
LONG TERM AGREEMENTS - NOTES
TRACT 8246
Supplemental fields
Address
5850 WEST LAS POSITAS BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Facilities to the City as public facilities; (4) upon Developer having the Unit Meters installed, <br />City will maintain, repair, replace, and inspect the Unit Meters at Developer's cost and expense; <br />and (5) upon formation of the HOA for the Project, Developer will transfer and assign to the <br />HOA Developer's rights and obligations set forth in this Agreement. <br />F. City and Developer desire to enter into this Agreement to memorialize their <br />agreement outlined in Recital E and to set forth additional rights and obligations of the Parties <br />relating to the Unit Meters. <br />G. City and Developer desire to enter into this Agreement to ensure that each of the <br />ninety-four condominium units in the Project has its own Unit Meter so that each condominium <br />unit owner receives his or her own utility bill and water consumption information from the City <br />for water usage and sewer services as provided in Pleasanton Municipal Code Titles 14 Water <br />and 15 Sewerage. <br />AGREEMENT <br />Based upon the foregoing Recitals, which are incorporated into this Agreement by this <br />reference, and for good and valuable consideration, the adequacy of which is hereby acknowledged <br />by both Parties, City and Developer hereby agree as follows: <br />1. Purpose. The purpose of this Agreement is to set forth the Parties' respective <br />rights and obligations with respect to the construction, installation, maintenance, repair, <br />replacement, and inspection of the Unit Meters. The Parties agree that this Agreement is <br />intended to be consistent with the Entitlements for the Project, but to the extent of any <br />inconsistency this Agreement shall supersede the Entitlements and shall govern and control. . <br />2. Fees. Developer shall pay the Meter Fee, the City Connection Fee (subject to any <br />credit for the existing meter), and the North Pleasanton Improvement District connection fee <br />(subject to any credit) for the Unit Meters in accordance with the Fee Schedule attached as DA <br />Exhibit B to the Development Agreement. City shall not collect or require Developer to pay the <br />Zone 7 Connection Fee for the Unit Meters, except that if Zone 7 requires City to collect the <br />Zone 7 Connection Fee for some or all of the Unit Meters, Developer shall pay the Zone 7 <br />Connection Fee as required. City shall not make any commitment or agreement with Zone 7 <br />regarding Zone 7 Connection Fees for the Unit Meters without first cooperating with Developer <br />and allowing Developer an opportunity to negotiate with Zone 7 to resolve the dispute. <br />3. Developer's Conditional Obligation to Construct Distribution Facilities and have <br />Installed Unit Meters. Nothing in this Agreement is intended or shall be interpreted as a covenant <br />by Developer that it will develop the Project or that it will do so on any particular schedule; <br />provided, however, that if Developer elects in its sole and absolute discretion to develop the <br />Project it shall be responsible for constructing the Distribution Facilities and having installed the <br />Unit Meters in compliance with all applicable City standards and specifications. If Developer <br />phases construction of the Project, construction of the Distribution Facilities and having the Unit <br />Meters installed may be phased accordingly, subject to the reasonable approval of the City <br />Engineer or his/her designee. <br />MAINTENANCE AGREEMENT --WATER METERS -2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.