My WebLink
|
Help
|
About
|
Sign Out
15 ATTACHMENT 1
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
051623
>
15 ATTACHMENT 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2023 4:51:55 PM
Creation date
5/10/2023 3:54:52 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
168 City of Pleasanton Operating Budget • FY 2023/24 - FY 2024/25 <br />Department Accomplishments <br />• Successfully implemented a Stage 2 <br />water shortage with mandatory 15% water <br />conservation while promoting “Making <br />Conservation a Way of Life” <br />• Implemented a Pesticide Posting Program <br />• Created the City’s first comprehensive Water <br />System Model <br />• Developed division strategic plans in <br />alignment with the department Strategic <br />Implementation Action Plan <br />• Activated the Department Operations Center <br />(DOC) for Storm Events <br />• Implemented and trained staff for the <br />upgrade of the cloud-based Computerized <br />Maintenance Management System (CMMS) <br />• Initiated a Council-directed water supply <br />alternatives project <br />• Developed and collaborated with other <br />departments on a detailed vehicle and <br />equipment replacement funding plan <br />• Implemented full mobile capabilities for all <br />department staff <br />• Successfully implemented Interactive Voice <br />Response (IVR), an automated phone <br />system to take utility billing payments 24 <br />hours seven days a week <br />Department Goals & Objectives <br />• Evaluate long-term water supply alternatives <br />• Meet emerging regulatory requirements for <br />water, wastewater, storm, and water <br />conservation <br />• Complete and update the Utility Rates Study <br />for water, sewer, and recycled water <br />• Implement and enhance customer service <br />and business process technologies <br />• Create a roadmap and initiate inventories <br />of City facilities and infrastructure to identify <br />improvements or replacements needed to <br />be incorporated into the 10-year Capital <br />Improvement Plan (CIP) <br />• Implement the Climate Action Plan to promote <br />energy conservation and environmental <br />sustainability <br />• Implement and periodically update the <br />department’s emergency preparedness plan <br />and provide emergency response training for <br />staff <br />• Assess and convert vehicles, large and hand- <br />held landscape equipment to electric <br />• Implement the workforce development <br />program that ensures compliance with safety <br />standards, fulfills training requirements for <br />certifications and classification descriptions, <br />and professional development <br />• Update Water & Sewer Master Plans <br />• Update utility rates <br />• Initiate use of alternative pesticide <br />management treatment at designated park <br />• Conduct ongoing Water Supply Assessment
The URL can be used to link to this page
Your browser does not support the video tag.