Laserfiche WebLink
<br />Sites Inventory and Methodology City of Pleasanton | B-23 <br />Table B-11: Existing Uses on Nonvacant Lower Income Sites and Potential Areas for Lower Income <br />Rezoning <br />APN or Area1 Existing Use <br />094 011400700 Restaurant (vacant) <br />094 011400800 Single-family residences (2 units), surface parking lot <br />094 015700104 Commercial buildings (insurance office), surface parking lot <br />094 015700112 <br />Multi-tenant commercial buildings/offices (pizzeria, attorney’s office, brokerage <br />firm, polygraph testing, skin and body care), surface parking lot <br />946 110003902 Furniture store, surface parking lot <br />946 110004000 Furniture store <br />Area 2: Stoneridge Shopping <br />Center Stoneridge Shopping Center, surface parking lots <br />Area 5: Laborer Council Office building and surface parking <br />Area 6: Signature Center Office buildings, parking structures, surface parking lots <br />Area 7: Hacienda Terrace Surface parking2 <br />Area 9: Metro 580 Commercial/Retail (Vacant, Party City) and surface parking3 <br />Area 12: Pimlico Area (North Side) Commercial (car rental, car sales and car wash) and surface parking <br />Area 18: Valley Plaza Multi-tenant commercial center, restaurants, and surface parking <br />Area 20: Boulder Street Construction contractor and concrete mix supplier with minimal site <br />improvements <br />1 Details for each individual parcel within each Area are contained in Tables B-14 and B-15. <br />2 Area of parcel to be rezoned for housing is an excess portion of existing surface parking. <br />3 Area of parcel to be rezoned for housing contains a single-story commercial building with two tenant spaces. One <br />of the tenant spaces is vacant, and the other has had frequent tenant turnover, but is currently occupied by Party <br />City. <br />Source: City of Pleasanton, Alameda County Assessor, LWC <br /> <br />As described in Program 1.3, the City is committed to work actively with BART to support the <br />disposition and re-development of the BART-owned property at the Dublin-Pleasanton station. <br />The City has already developed and adopted Objective Design Standards for the BART and <br />other housing sites, and, per Housing Element Program 1.3 will move forward with pre- <br />development planning including re-zoning, completion of a concept plan, public outreach and <br />work with BART to begin to solicit developer interest. Concept planning work is expected to be <br />complete by the end of 2025. Based on review of recent similar partnership projects, <br />subsequent steps and timing would include: <br />• Issuance of a developer RFQ/RFP and selection of a preferred project team (4-6 <br />months) <br />• Negotiation of agreements (ENA, ground lease or similar (1 year) <br />• Design development, financing and permitting (18 months) <br />• Construction (12-14 months)