My WebLink
|
Help
|
About
|
Sign Out
RES 231414
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2023
>
RES 231414
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2023 10:58:40 AM
Creation date
10/23/2023 10:17:59 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
9/19/2023
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
542
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />B-34 | City of Pleasanton Sites Inventory and Methodology <br />Area 6 – Signature Center <br />Location: 4900 & 5000 Hopyard Road <br />APN: 941 130105700, 941 130105800, <br />941 130105900, <br />941 130106001 <br />General Plan Designation: Business <br />Park <br />Current Zoning Designation: Planned <br />Unit Development – <br />Industrial/Commercial-Office (PUD-I/C-O) <br />Lot Size (or portion of property <br />proposed for development): 14.66 acres <br />Proposed General Plan Designation: Housing <br />Element Overlay <br />Potential Number of Housing Units: Between <br />330 and 440 units (maximum), developed at a density of 30-40 DUA. Development was <br />originally contemplated on 11 of the 14.66 acres at 30-40 DUA. To provide additional <br />flexibility, development is permitted across the entire 14.66-acre area, however, the minimum <br />density remains at 30 DUA and the maximum unit count remains at 440 to remain consistent <br />with the environmental analysis. <br />Background and Description: <br />The area consists of four parcels, two on the north side of Clorox Way and two on the south <br />side of Clorox Way. Two of the parcels are each developed with a four-story office building, <br />and the two other parcels each have a two-story parking structure; all four sites have surface <br />parking. <br />Key Considerations and Feasibility for Site Development: <br />The Signature Center sites consist of two four-story office buildings built in 1985 and 1986 <br />and separate parking structures. The property owners have proposed housing development <br />on the property at a density of 30-40 DU/acre. <br />The site is located on a major arterial and within ½ mile of the East Dublin/Pleasanton BART <br />station and I-580 freeway access. In addition, the site is located near a high concentration of <br />office and employment uses in the area. <br /> <br />Hatching represents portion for development. <br />Flexibility in the precise location of future <br />housing within the larger site is permitted per <br />Program 1.7.
The URL can be used to link to this page
Your browser does not support the video tag.