Laserfiche WebLink
printing and mailing costs will be needed during drought for notices sent to customers regarding changes in their <br />rates and mandatory water usage restrictions. <br />Table 5-6 shows the Zone 7 variable costs at each stage of drought,respectively.As water usage is reduced,less <br />water needs to be purchased from Zone 7. Table 5-6,Line 2 shows the cost savings in each stage of drought <br />compared to the cost of water from Zone 7 under Baseline conditions. <br />Table 5-7 shows the total cost of drought at Stages 1 through 6,which includes the lost commodity revenue(Table <br />5-4,Line 12),increased operating costs(Table 5-5,Line 4), and Zone 7 variable cost savings(Table 5-6,Line 2). <br />62 CITY OF PLEASANTON