Laserfiche WebLink
ATTACHMENT 6 <br /> RAFTELIS <br /> Financial Plan Alternative <br /> To: Tamara Baptista <br /> From: Brian Bass, Lindsay Roth <br /> Date: November 2, 2023 <br /> Re: Financial Plan Alternative <br /> The purpose of this memorandum is to complete a sensitivity analysis to determine if the proposed rate <br /> increase for FY 2025 can be revised consistent with the methodology in the Water and Recycled Water <br /> Rate Study (Raftelis, August 4, 2023). The alternative presented in this memorandum evaluates different <br /> terms for the $61VI loan and aims to achieve the operating reserve target in FY 2027 instead of FY 2026. <br /> The study period for the water and recycled water rate study is from FY 2024 through FY 2026 and <br /> proposes the following rate increases: 30%, 20%, and 12%. It assumes a $61VI loan in FY 2024 to pay <br /> for capital costs with a 5% interest rate over five years. Phase 2 capital costs were not included and <br /> were beyond the scope of this engagement. <br /> Alternative <br /> This alternative consists of a $61VI loan with a 5% interest rate for a twenty-year term. The CIP from the <br /> rate study is used without any changes. The operating reserve target is achieved by FY 2027 with the <br /> rate increases shown in Table 1 in the first two years of the study period. Thus, the proposed rate <br /> increase for FY 2025 could be reduced from 20% to 12% in the original water rate and cost of service <br /> model used for the Proposition 218 Notification as provided in the Water and Recycled Water Rate <br /> Study. FY 2026 and FY 2027 are not shown in Table 1 because Phase 2 capital costs were not <br /> included. <br /> Table 1: Alternative Rate Increases <br /> Description FY 2024 FY 2025 <br /> Rate Increase 30.0% 12.0% <br /> 445 S. Figueroa Street,Suite 1925, Los Angeles,CA 90071 <br /> www.raftelis.com <br />