Laserfiche WebLink
Table 3-2: FY 2024 Recycled Water Revenue Requirement <br />Line RW Revenue Requirement1 Operating <br />1 Revenue Requirements <br />2 O&M Expenses 2,452,078 2,452,078 <br />3 Debt Service 1,415,535 $1,415,535 <br />4 Rate Funded Capital Projects 50,000 50,000 <br />5 Total-Revenue Requirements 2,452,078 $1,465,535 $3,917,613 <br />6 <br />7 Revenue Offsets <br />8 Other Revenues 969,462) 969,462) <br />9 Interest Income 0 0 <br />10 Total-Revenue Offsets 969,462) 0 ($969,462) <br />11 <br />12 Adjustments <br />13 Adjustment for Cash Balance 382,631) 382,631) <br />14 Adjustment to Annualize Rate Increase 488,325 488,325 <br />15 Total-Adjustments 105,694 0 105,694 <br />16 <br />17 Revenue Required From Rates 1,588,310 $1,465,535 $3,053,845 <br />Table 3-3 shows the revenue requirement for Zone 7 fixed and variable charges. Since these costs are recovered <br />through a separate passthrough rate,their revenue requirement is excluded from the other water and recycled water <br />revenue requirements. The revenue requirements are composed of the Zone 7 Fixed Charges(Column D,Line 2) <br />and the Zone 7 Variable Charges(Column D,Line 3),which are placed into the corresponding fixed and variable <br />cost components.The total passthrough revenue requirement is shown in Line 4. <br />Table 3-3: FY 2024 Passthrough Revenue Requirement <br />Line Passthrouah - FY 2024 Fixed Variable To <br />1 Revenue Requirements <br />2 Zone 7 Fixed Charges 9,314,331 9,314,331 <br />3 Zone 7 Variable Charges 12,795,669 12,795,669 <br />4 Total-Revenue Requirements 9,314,331 12,795,669 22,110,000 <br />3.3• Water System Functions <br />After determining the water utility's revenue requirement,the next step in a COS analysis is to categorize operating <br />and capital costs into system functions. Raftelis worked with City staff to determine the appropriate functions for <br />the operating and capital.The functions for O&M include labor,electricity, other expenses, and attrition savings. <br />The function for capital costs is water capital costs related to the City's water distribution system. <br />Operating costs are functionalized based on actual costs and spreading costs between base,max day,and max <br />hour. For Labor,Electricity,and Other Expenses,actual cost estimates provided by City staff'were allocated to <br />Meter and Customer functions. The remaining costs were allocated based on average max day/max hour <br />proportions since the water system is primarily transmission and distribution.This is seen in Table 34. <br />34 CITY OF PLEASANTON