Laserfiche WebLink
INTERCONNECTION AGREEMENT FOR <br /> NET ENERGY METERING 2 (NEM2) <br /> OF A RENEWABLE ELECTRIC GENERATING FACILITY <br /> Pacific Gas and OF 1 ,000 KW OR LESS, EXCEPT NEM2 SOLAR OR WIND <br /> Electric Company FACILITIES OF 30 KW OR LESS, AND VIRTUAL NET <br /> ENERGY METERING (NEM2V) OF A RENEWABLE <br /> ELECTRIC GENERATING FACILITY OF 1 ,000 KW OR <br /> LESS <br /> 17. CRD POWER CONTROL SYSTEM CERTIFICATION <br /> When applicable, Customer-Generator confirms that the Renewable Electrical Generation <br /> Facility including Energy Storage over 10 kW that has received UL 1741 CRD for Power Control <br /> Systems (PCS) certification will comply with either No Grid Charge or No Storage Export as <br /> defined in Schedule NEM2. <br /> 18. AMENDMENT AND MODIFICATION <br /> This Agreement can only be amended or modified in writing, signed by both Parties. <br /> 19. ENTIRE AGREEMENT <br /> This Agreement, including any incorporated Tariff Schedules and Rules, contains the entire <br /> Agreement and understanding between the Parties, their agents, and employees as to the <br /> subject matter of this Agreement. Each party also represents that in entering into this <br /> Agreement, it has not relied on any promise, inducement, representation,warranty, agreement <br /> or other statement not set forth in this Agreement or in the incorporated Tariff Schedules and <br /> Rules. <br /> 20. SIGNATURES <br /> IN WITNESS WHEREOF, the Parties hereto have caused this Agreement to be executed by <br /> their duly authorized representatives. This Agreement is effective as of the last date set forth <br /> below. <br /> CITY OF PLEASANTON PACIFIC GAS AND ELECTRIC COMPANY <br /> (Cu o -Genergtor's Name) <br /> (Signature) (Signature) <br /> 67E6Kt7 I;&qNQW <br /> -� ( rint Name) (Print Name) <br /> Cl l L /'f"^�r�Cs� <br /> (Title) (Title) <br /> (Date) (Date) <br /> AP ED S TO FORM: <br /> CITY ATTORNEY <br /> Automated Document, Preliminary Statement A Page 11 of 11 <br /> Form 79-1220-02 <br /> Advice 4773-G/6976-E <br /> June 2023 <br />