Laserfiche WebLink
INTERCONNECTION AGREEMENT FOR <br /> NET ENERGY METERING 2 (NEM2) <br /> OF A RENEWABLE ELECTRIC GENERATING FACILITY <br /> PacificGasandOF 1 ,000 KW OR LESS, EXCEPT NEM2 SOLAR OR WIND <br /> Electric Company' FACILITIES OF 30 KW OR LESS, AND VIRTUAL NET <br /> ENERGY METERING (NEM2V) OF A RENEWABLE <br /> ELECTRIC GENERATING FACILITY OF 1 ,000 KW OR <br /> LESS <br /> 2.3 Customer-Generator's electric service agreement ID number: 9443365130 <br /> (Assigned by PG&E). <br /> 2.4 Name and address used by PG&E to locate the electric service account used to <br /> interconnect the Generating Facility with PG&E's Electric System: <br /> Name: CITY OF PLEASANTON <br /> Address: 4455 BLACK AVE <br /> City/Zip Code: PLEASANTON 94566 <br /> 2.5 The Gross Nameplate Rating of the Generating Facility: 315.740 kW <br /> 2.6 The Net Nameplate Rating of the Generating Facility: 199.793 kW <br /> 2.7 The expected annual energy production of the Generating Facility is kWh. <br /> 2.8 Customer-Generator's otherwise-applicable rate schedule as of the execution of this <br /> Agreement is B19S <br /> 2.9 The Generating Facility's expected date of Initial Operation is 07/31/2025 <br /> The expected date of Initial Operation shall be within two years of the date of this <br /> Agreement. <br /> 2.10 Smart Inverters-For Customer-Generator applications received on or after September <br /> 9, 2017, the Customer-Generator certifies that their inverter-based Generating <br /> Facilities fully comply with Section Hh of Rule 21, including configuration of protective <br /> settings and default settings, in accordance with the specifications therein. <br /> Distribution Provider may require a field verification of the Customer-Generator's <br /> inverter. Customer-Generator further agrees to cooperate fully with any such request <br /> and make their inverter available to the Distribution Provider for such verification. <br /> Customer-Generator understands that in the event the inverter is not set in accordance <br /> with Section Hh of Rule 21, Customer-Generator will need to cease operation of <br /> generating facility until verification is confirmed by Distribution Provider. <br /> (Solar inverter models and firmware versions that comply with Rule 21 Section Hh can <br /> be found at https://www.energy.ca.gov/programs-and-topics/topics/renewable- <br /> energy/solar-equipment-lists.) <br /> Verification of compliance with such requirements shall be provided by the Customer- <br /> Generator upon request by PG&E in accordance with PG&E's Electric Rule 21. <br /> An "existing inverter" is defined as an inverter that is a component of an existing <br /> Generating Facility that meets one or more of the following conditions: <br /> (a) it is already approved by PG&E for interconnection prior to September 9, 2017 <br /> (b) the Customer-Generator has submitted the interconnection application prior to <br /> September 9, 2017, <br /> (c) the Customer-Generator provides evidence of having applied for an electrical <br /> permit for the Generating Facility installation that is dated prior to September 9, <br /> Automated Document,Preliminary Statement A Page 2 of 11 <br /> Form 79-1220-02 <br /> Advice 4773-G/6976-E <br /> June 2023 <br />