My WebLink
|
Help
|
About
|
Sign Out
PACIFIC GAS AND ELECTRIC - INTERCONNECTION AGREEMENT NEM2V
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
P
>
PACIFIC GAS AND ELECTRIC - INTERCONNECTION AGREEMENT NEM2V
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2026 3:20:47 PM
Creation date
11/7/2023 4:08:44 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
7/31/2025
LONG TERM AGREEMENTS - NAME
PACIFIC GAS & ELECTRIC
LONG TERM AGREEMENTS - TYPE
MISC AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERCONNECTION AGREEMENT FOR <br /> NET ENERGY METERING 2 (NEM2) <br /> OF A RENEWABLE ELECTRIC GENERATING FACILITY <br /> Pacific Gas and OF 1 ,000 KW OR LESS, EXCEPT NEM2 SOLAR OR WIND <br /> Electric Company` FACILITIES OF 30 KW OR LESS, AND VIRTUAL NET <br /> ENERGY METERING (NEM2V) OF A RENEWABLE <br /> ELECTRIC GENERATING FACILITY OF 1 ,000 KW OR <br /> LESS <br /> 5.6 Customers on this tariff must pay for the interconnection of their Generation Facilities <br /> as provided in Electric Rule 21, pursuant to Decision 16-01-044. <br /> 6. INTERCONNECTION FACILITIES <br /> 6.1 Customer-Generator and/or PG&E, as appropriate, shall provide Interconnection <br /> Facilities that adequately protect PG&E's Electric System, personnel, and other <br /> persons from damage or injury, which may be caused by the operation of Customer- <br /> Generator's Generating Facility. <br /> 6.2 Customer-Generator shall be solely responsible for the costs, design, purchase, <br /> construction, permitting, operation, and maintenance of the Interconnection Facilities <br /> that Customer-Generator owns. <br /> 6.3 If the provisions of PG&E's Electric Rule 21, or any other tariff or rule approved by the <br /> Commission, require PG&E to own and operate a portion of the Interconnection <br /> Facilities, Customer-Generator and PG&E shall promptly execute an Special Facilities <br /> Agreement that establishes and allocates responsibility for the design, installation, <br /> operation, maintenance,and ownership of the Interconnection Facilities. This Special <br /> Facilities Agreement shall be attached to and made a part of this Agreement as <br /> Appendix B. <br /> 7. LIMITATION OF LIABILITY <br /> Each Party's liability to the other Party for any loss, cost, claim, injury, liability, or expense, <br /> including reasonable attorney's fees, relating to or arising from any act or omission in its <br /> performance of this agreement, shall be limited to the amount of direct damage actually <br /> incurred. In no event shall either Party be liable to the other Party for any indirect, special, <br /> consequential, or punitive damages of any kind whatsoever. <br /> 8. INSURANCE <br /> 8.1. Customer-Generator Facility is required to comply with standards and rules set forth in <br /> Section 5 and provide the following for insurance policies in place. <br /> (a) For NEM2V Customer-Generators only, to the extent that Customer- <br /> Generator has currently in force property insurance and commercial general <br /> liability or personal liability insurance, Customer-Generator agrees that it will <br /> maintain such insurance in force for the duration of this Agreement in no less <br /> amounts than those currently in effect. Pacific Gas and Electric Company <br /> shall have the right to inspect or obtain a copy of the original policy or policies <br /> of insurance prior to commencing operation. As long as Customer- <br /> Generator meets the requirements of this Section 8.1(a), Customer- <br /> Generator shall not be required to purchase any additional liability insurance. <br /> ❑ I have insurance. I hereby certify that there is presently insurance <br /> coverage in the amount of$ for the Schedule NEM2V <br /> Generating Facility location. <br /> Automated Document, Preliminary Statement A Page 6 of 11 <br /> Form 79-1220-02 <br /> Advice 4773-G/6976-E <br /> June 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.