Laserfiche WebLink
INTERCONNECTION AGREEMENT FOR <br /> NET ENERGY METERING 2 (NEM2) <br /> OF A RENEWABLE ELECTRIC GENERATING FACILITY <br /> Pacific Gas and OF 1 ,000 KW OR LESS, EXCEPT NEM2 SOLAR OR WIND <br /> Electric Company FACILITIES OF 30 KW OR LESS, AND VIRTUAL NET <br /> ENERGY METERING (NEM2V) OF A RENEWABLE <br /> ELECTRIC GENERATING FACILITY OF 1 ,000 KW OR <br /> LESS <br /> 10. NOTICES <br /> 10.1 Any written notice, demand, or request required or authorized in connection with this <br /> Agreement (Notice) shall be deemed properly given if delivered in person or sent by <br /> first class mail, postage prepaid, to the person specified below: <br /> If to PG&E: Pacific Gas and Electric Company <br /> Attention: Electric Grid Interconnection–Contract Management <br /> 300 Lakeside Drive, Suite 210 <br /> Oakland, CA 94612 <br /> Email: EGIContractMgmt(a)_pge.com <br /> If to Customer-Generator: <br /> C mer-GgneratQr Name:: CITY OF PLEASANTON <br /> Ad rens: C) 1-ty //o J' r 5 le A I <br /> City: E120. rl o -A 1�;5be <br /> Phone: i—� <br /> C111— <br /> FAX:( y,a�� J3 J�ga <br /> 10.2 A Party may change its address for Notices at any time by providing the other Party <br /> notice of the change in accordance with Section 10.1. <br /> 10.3 The Parties may also designate operating representatives to conduct the daily <br /> communications, which may be necessary or convenient for the administration of this <br /> Agreement. Such designations, including names, addresses, and phone numbers <br /> may be communicated or revised by one Party's Notice to the other. <br /> 11. REVIEW OF RECORDS AND DATA <br /> 11.1 PG&E shall have the right to review and obtain copies of Customer-Generator's <br /> operations and maintenance records, logs, or other information such as Generating <br /> Facility availability, maintenance outages, circuit breaker operation requiring manual <br /> reset, relay targets and unusual events pertaining to Customer-Generator's Generating <br /> Facility or its interconnection to PG&E. <br /> 11.2 Customer-Generator authorizes to release to the California Energy Commission(CEC) <br /> information regarding Customer-Generator's facility, including customer name and <br /> Generating Facility location, size, and operational characteristics, as requested from <br /> time to time pursuant to the CEC's rules and regulations. <br /> 12. ASSIGNMENT <br /> Customer-Generator shall not voluntarily assign its rights nor delegate its duties under this <br /> Agreement without PG&E's written consent. Any assignment or delegation Customer- <br /> Generator makes without PG&E's written consent shall not be valid. PG&E shall not <br /> unreasonably withhold its consent to Customer-Generator's assignment of this Agreement. <br /> Automated Document,Preliminary Statement A Page 9 of 11 <br /> Form 79-1220-02 <br /> Advice 4773-G/6976-E <br /> June 2023 <br />