Laserfiche WebLink
<br />6 <br /> <br /> <br />With respect to biological resources, Raney will rely on the applicant-provided Arborist Report <br />and Biological Resources Analysis Memorandum for use in the analysis. As discussed in Task 2, <br />Raney will internally review the provided technical reports for accuracy and adequacy in meeting <br />the requirements of CEQA, and incorporate the results of the analysis into the biological resources <br />section of the IS. <br /> <br />With respect to geology and soils, Raney will rely on the applicant-provided Geotechnical <br />Investigation for use in the analysis. As discussed in Task 2, Raney will internally review the <br />technical report for accuracy and adequacy in meeting the requirements of CEQA, and incorporate <br />the results of the analysis into the geology and soils section of the IS. <br /> <br />With respect to hazards and hazardous materials, Raney will rely on the applicant-provided Phase <br />I ESA and Limited Soil Quality Evaluation for use in the analysis. As discussed in Task 2, Raney <br />will internally review the technical reports for accuracy and adequacy in meeting the requirements <br />of CEQA, and incorporate the results of the analysis into the hazards and hazardous materials <br />section of the IS. <br /> <br />Raney will complete the following deliverables: <br />• One electronic copy of the Administrative Draft Modified IS Checklist to the City for <br />review. <br /> <br />Task 4 Prepare Screencheck Draft Modified IS Checklist, Final Modified IS <br />Checklist, and Notice of Exemption <br />The objective of this task is to review the findings of the Administrative Draft Modified IS <br />Checklist with the City. For purposes of this scope, it is assumed that the IS evaluation will confirm <br />that the conditions in Section 15183 will be met, such that the project’s environmental effects will <br />not require further CEQA review. Raney will revise the Administrative Draft Modified IS <br />Checklist based on the comments received from City staff and prepare a Screencheck Draft <br />Modified IS Checklist in track changes format. The City will then review the Screencheck Draft <br />Modified IS Checklist to provide any additional comments. Raney will revise the Screencheck <br />Draft Modified IS Checklist based on the comments received from City staff and prepare a Final <br />Modified IS Checklist. In addition, Raney will prepare the Notice of Exemption (NOE). <br /> <br />Raney will provide the following deliverables: <br />• Submit one electronic version of the Screencheck Draft Modified IS Checklist to the City <br />that incorporates City comments; <br />• Revise the Screencheck Draft Modified IS Checklist, based on additional City comments; <br />• Submit one electronic version of the Final Modified IS Checklist to the City; and <br />• Prepare the NOE. <br /> <br />Task 5 Project Management <br />The objective of this task is to ensure extensive coordination with City staff throughout the <br />processing of the environmental document. Raney assumes attendance at up to one virtual public <br />hearing will be required. Attendance at additional public hearings or meetings could easily be <br />accommodated upon request and would be billed on a time-and-materials basis following Raney’s <br />standard billing rates. <br />DocuSign Envelope ID: 3FA212B2-C9C9-4BE6-8FD2-66034B064F8CDocuSign Envelope ID: FE1B6497-6527-4DEE-8F28-BF9999E929AA