Laserfiche WebLink
<br />8 <br /> <br /> <br />S <br />e <br />n <br />i <br />o <br />r <br /> <br />V <br />i <br />c <br />e <br /> <br />P <br />r <br />e <br />s <br />i <br />d <br />e <br />n <br />t <br />P <br />r <br />o <br />j <br />e <br />c <br />t <br /> <br />D <br />i <br />r <br />e <br />c <br />t <br />o <br />r <br />P <br />r <br />o <br />j <br />e <br />c <br />t <br /> <br />M <br />a <br />n <br />a <br />g <br />e <br />r <br />A <br />s <br />s <br />o <br />c <br />i <br />a <br />t <br />e <br />C <br />o <br />s <br />t <br /> <br />P <br />e <br />r <br /> <br />T <br />a <br />s <br />k <br />Task 1 Project Initiation 3 3 1,110$ <br />Task 2 Peer Review of Applicant-Provided Technical Reports 2 10 2,140$ <br />Task 3 Prepare Administrative Draft Modified IS Checklist 2 5 8 48 9,285$ <br />Task 4 <br />Prepare Screencheck Modified IS Checklist, Final <br />Modified IS Checklist, and Notice of Exemption 4 5 14 3,545$ <br />Task 5 Project Management and Meetings 4 16 3,580$ <br />Total Hours 2 18 42 62 <br />Hourly Rate 215$ 195$ 175$ 135$ <br />Total Labor 430$ 3,510$ 7,350$ 8,370$ 19,660$ <br />Sub-Consultants & Expenses 935$ <br />Copying/Printing/Travel/Postage/Etc.*350$ <br />CHRIS Search 500$ <br />10% administrative fee 85$ <br />Total Budget 20,595$ <br />*Estimate only and will be billed at cost. <br />3200 Hopyard Residential Project Modified IS Checklist <br />COST ESTIMATE <br />COST ESTIMATE <br />The cost for completion of the 3200 Hopyard Residential Project Modified IS Checklist is <br />anticipated not to exceed $20,595. The tasks are summarized in the Technical Scope of Services <br />of this proposal and costs by task are shown in the attached spreadsheet. These costs are based on <br />the estimates of time for each task, following Raney’s standard billing rates. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />The following assumptions have been made in the calculations: <br /> <br />• Raney assumes attendance at meetings and hearings will not be included in this scope of <br />work; however, attendance at meetings and hearings could easily be accommodated and <br />would be billed on a time-and-materials basis, as directed. <br />• Raney costs are based on the assumption that the existing data and information for the City <br />and the proposed project area is accurate and current and will be available for the <br />preparation of the proposed environmental documents. <br />DocuSign Envelope ID: 3FA212B2-C9C9-4BE6-8FD2-66034B064F8CDocuSign Envelope ID: FE1B6497-6527-4DEE-8F28-BF9999E929AA