My WebLink
|
Help
|
About
|
Sign Out
RANEY PLANNING & MANAGEMENT, INC. (#2024409)
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
R
>
RANEY PLANNING & MANAGEMENT, INC. (#2024409)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2024 3:38:41 PM
Creation date
12/11/2023 1:25:53 PM
Metadata
Fields
Template:
CONTRACTS
Description Type
Professional Services
Contract Type
New
NAME
RANEY PLANNING & MANAGEMENT, INC.
Contract Record Series
704-05
Munis Contract #
2024409
Contract Expiration
4/30/2024
NOTES
PSA ENTERED INTO TM; REINBURSEMENT AGREEMENT NOT ENTERED, BUT ROUTED FOR SIGNATURES
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />10 <br /> <br />Proposal <br />Task Fees <br />Total FCS Professional Fee $41,095 <br /> <br />Assumptions <br />The assumptions used in calculating the above fees are: <br />• If project design changes or revisions to the transportation analysis occur such that remodeling for <br />the purposes of the air quality, GHG emissions, energy, and noise analyses is required, any <br />additional modeling would be completed under an augment. <br />• Reimbursable expenses have been included in the table above. These direct costs, including, but <br />not limited to those items presented below, will be reimbursable upon provision of proper <br />documentation: <br />- Purchases of project materials <br />- Reproduction, reprographics, document production, printing, and photographic <br />- Postage, messenger, delivery, and overnight mailing <br />- Mileage, noticing, and record searches <br />- Other miscellaneous costs directly related to the project <br />• There will be no significant revisions to the development application. If there is a change in the <br />project description by the applicant, a budget and schedule adjustment will be required to <br />account for the project revisions. <br />• The fee is valid for up to 30 days from the date of this scope, after which it may be subject to <br />revision. <br />• This price is based on completion of the work within the proposed schedule. If delays occur, an <br />update to the schedule and amendment of the budget would be warranted to accommodate <br />additional project management and other costs and to reflect the adjustments. <br />• Costs have been allocated to tasks based upon FCS’s proposed approach. During the work, FCS <br />may, on its sole authority, re-allocate costs among tasks and/or direct costs, as circumstances <br />warrant, so long as the adjustments maintain the total price within its authorized amount. <br />• The FCS Project Manager will be the primary representative at the project meeting and public <br />hearing. <br />• This Scope assumes that all deliverables will be submitted electronically. Printing costs are based <br />on the method of printing and binding proposed, numbers of copies proposed as work products, <br />and estimated page lengths. On further clarification of the documents (paper and/or digital CD) <br />that city staff will need during the preparation effort, FCS will specifically identify a detailed <br />reproduction work plan with specific costs. <br />DocuSign Envelope ID: FE1B6497-6527-4DEE-8F28-BF9999E929AA
The URL can be used to link to this page
Your browser does not support the video tag.