Page 1 of 3 <br />Item #16 <br /> CITY COUNCIL AGENDA REPORT <br /> <br />December 19, 2023 <br />Public Works - Engineering Division <br /> <br />TITLE: AUTHORIZE CONTRACT CHANGE ORDER NO. 1 IN THE NOT-TO-EXCEED <br />AMOUNT OF $100,000 TO THE EXISTING CONTRACT WITH GOLDEN STATE <br />CONSTRUCTION & UTILITY, INC., FOR THE ANNUAL SEWER COLLECTION <br />SYSTEM IMPROVEMENTS PROJECT, CIP NO. 24278 <br /> <br />SUMMARY <br />On October 3, 2023, the City Council awarded a contract to Golden State Construction and & <br />Utility, Inc., for the not-to-exceed amount of $544,000 and authorized the Director of Public <br />Works to execute change orders up to $82,000 for the Annual Sewer Collection System <br />Improvements Project, CIP No. 24278. The project is currently under construction and <br />addresses several sewer lines and structures needing replacement or rehabilitation. Specific to <br />one project area, when the sewer line near the basketball court in Meadowlark Park was <br />potholed, elevations of the existing sewer line were different than anticipated, requiring the <br />work to be redesigned with a new alignment to provide adequate slope for the pipe while <br />avoiding impacting the basketball court. The new alignment requires an additional 220 feet of <br />piping, an additional manhole, 400 square feet of concrete and asphalt restoration, and the <br />removal and replacement of six trees. The contract change order for the not-to-exceed amount <br />of $100,000 covers the additional costs to install the sewer line, correcting a segment of sewer <br />line under the basketball court that has settled, which caused the line to back up and require <br />monthly cleaning. The final payment amount for the work included in Change Order No. 1 will <br />be determined by the actual field-measured quantities. <br /> <br />RECOMMENDATION <br />1. Authorize Contract Change Order No. 1 in the not-to-exceed amount of $100,000 to the <br />existing contract with Golden State Construction & Utility, Inc., as part of the Annual <br />Sewer Collection System Improvements, CIP No. 24278. <br />2. Authorize the Director of Public Works to approve a project contingency and execute <br />contract change order(s) for $182,000, an increase of $100,000 from the original <br />contingency of $82,000 for unforeseen yet necessary related work. <br /> <br /> <br />BACKGROUND <br />This project is part of the annual maintenance program, which includes replacement or <br />rehabilitation of sewer pipelines and structures. Sewer replacement and rehabilitation projects <br />are selected from a list of problem areas or potential problem areas identified and maintained <br />by the City. <br />Video surveillance of the existing eight-inch sewer main under Meadowlark Park reveals a <br />substantial sag, impacting flow and causing consistent buildup along the length of the pipe. <br />This line is currently hydro-jetted and cleared monthly. <br /> <br />Page 220 of 270