My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2023
>
121923 REGULAR
>
CITY COUNCIL AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2023 6:21:19 PM
Creation date
12/18/2023 6:19:26 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/19/2023
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 6 <br />Item #19 <br /> CITY COUNCIL AGENDA REPORT <br /> <br />December 19, 2023 <br />Public Works - Operations Division <br /> <br />TITLE: CONTINUED FROM DECEMBER 5, 2023 - RECEIVE AN UPDATE ON THE <br />DEVELOPMENT OF A WATER SYSTEM MANAGEMENT PLAN <br /> <br />SUMMARY <br />To ensure the effective management of its water system, the City is preparing a Water System <br />Management Plan (WSMP). Development of this plan includes a comprehensive review of the <br />various elements of the water enterprise, including administration, planning, operations and <br />maintenance, capital improvements, resources, and financing. The initial WSMP deliverable <br />includes a program assessment against industry benchmarks that helped to identify higher <br />priority areas of focus, and an appraisal level determination of capital improvement needs for <br />the water system equipment and facilities. An initial draft water enterprise 10-year Capital <br />Improvement Plan (CIP) is included in the development of this plan and has been formulated <br />to guide and plan for investment and replacement needs to ensure a high-performing and <br />sustainable water delivery system for the City. <br /> <br />RECOMMENDATION <br />Receive an update on the development of a Water System Management Plan. <br /> <br />BACKGROUND <br />The City distributes approximately 14,000 acre-feet of safe, reliable drinking water per year to <br />over 22,000 customers. The City has two sources of water supply: treated surface water and <br />groundwater purchased from Zone 7 Water Agency (Zone 7), and groundwater from City- <br />owned and operated wells with a total pumping allotment of 3,500 acre-feet per year. The <br />City’s distribution system consists of 20 storage tanks, 14 pump stations, and over 300 miles of <br />mostly underground piping. The annual operating budget for the water system program is <br />approximately $29 million (CIP expenditures not included). The City’s water system program <br />requires management of various elements, including administration, planning, operations and <br />maintenance, capital improvements, resources, and financing. <br /> <br />In April 2022, Council approved an agreement with Carollo Engineers to prepare the Water <br />System Management Plan. Evaluation of the water enterprise business practices and capital <br />planning is required to avoid major disruptions and maintain expected service levels. Based on <br />this, the City has initiated a Water System Management Plan (WSMP) that is envisioned to be <br />a comprehensive compilation of the standards and practices to be applied within a high- <br />performing water enterprise. The WSMP is to be a dynamic document, reviewed every three <br />years to evaluate its effectiveness and comprehensively updated every six years to ensure that <br />activities and projects are being implemented in a timely fashion. <br /> <br />DISCUSSION <br />Initial development of the WSMP is occurring in three phases; this report covers work <br />completed to date, including Phase 1 and the CIP part of Phase 2. <br />Page 234 of 270
The URL can be used to link to this page
Your browser does not support the video tag.