My WebLink
|
Help
|
About
|
Sign Out
01
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
HOUSING
>
AGENDAS
>
2024
>
021524
>
01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2024 4:34:53 PM
Creation date
2/7/2024 4:33:26 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/15/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
and a detailed scope of work for the project. <br />N/A <br /> <br />15. For Capital Improvement Projects (CIPs), describe land tenure status (e.g. does your agency own or lease the <br />property). If you do not have site control, describe your site control plan. <br />CDBG regulations require a "long-term lease" of a minimum of 15 years. <br />N/A <br /> <br />16. For Capital Improvement Projects (CIPs), will relocation be required if the building is occupied? <br />If yes, describe and upload your agency's relocation plan. If this is not applicable, enter "N/A". <br />N/A <br /> <br />17. For Capital Improvement Projects (CIPs), identify the project team (e.g. architect/engineer, contractor, and/or <br />consultants). <br />N/A <br /> <br />18. For Capital Improvement Projects (CIPs), has a Market Study, Property Needs Assessment and/or other <br />evaluation which identifies the need for the proposed project been completed? <br />If yes, describe and upload the study/assessment/evaluation. If this is not applicable, enter "N/A". <br />N/A <br /> <br />19. For Capital Improvement Projects (CIPs), how will this project comply with federal Davis-Bacon/Fair Labor <br />Standards Act requirements? <br />N/A <br /> <br /> <br />POLICY CONSISTENCY <br />20. Identify AT LEAST ONE Critical Human Services Need from the "City of Pleasanton Human Services Strategic <br />Plan Needs Assessment Update 2018-2022" that relates to your program/project. <br /> <br />21. Identify AT LEAST ONE critical systemic challenge from the "City of Pleasanton Human Services Strategic Plan <br />Needs Assessment Update 2018-2022" that relates to your program/project. <br /> <br />22. How will the program/project address the critical systemic challenge selection in question #22? <br />Staff generate and maintain a Resource Guide outlining services available from other agencies and organizations within our <br />service area, and work with case managers serving individuals and families whose homes need repair and referrals are traded <br />back and forth. Through these partnerships we serve the highest need clients. <br /> <br />In addition, Habitat leverages key personnel funded through other overlapping programs such as Renew AC to support staff. <br /> <br />Habitat’s Home Preservation Outreach Team strives to reach elderly and disabled low-income homeowners who are <br />underserved in part due to their limited mobility. Giving presentations at Senior Centers, tabling at grocery stores, including <br />inserts in public utility bills, and posting flyers at libraries are examples of methods employed to reach this population. Due to <br />the recent increase in residents who are home bound due to the pandemic, focus has primarily been on utility bill mailers and <br />advertising in local publications. <br /> <br /> <br />23. Identify AT LEAST ONE City of Pleasanton U.S. Department of Housing and Urban Development (HUD) FY 2020- <br />2024 Consolidated Plan "guiding principle" that relates to your program/project. <br /> Workforce Development/Unemployment <br /> Healthcare and Behavior Health <br /> Disability Services and Access <br /> Food and Nutrition <br /> Youth Services <br /> Senior Services <br /> Homeless in the Tri-Valley <br /> Services Provider Critical Initiatives <br /> Lack of consumer information about services/need for education <br /> Lack of coordination, missed opportunities for collaboration, duplication of services among service providers, and lack of <br />centralized database between service providers and public agencies <br /> Time and cost associated with obtaining services including transportation and connectivity of citizens to services
The URL can be used to link to this page
Your browser does not support the video tag.