Tri-Valley Local Hazard Mitigation Plan; Volume 2—Planning Partner Annexes
<br />3-16
<br />Benefits New
<br />or Existing
<br />Assets Objectives Met Lead Agency Support Agency
<br />Estimated
<br />Cost
<br />Sources of
<br />Funding Timelinea
<br />Action PLE-9—Prohibit new development of sites with structures intended for human occupancy in any landslide-prone areas unless the
<br />landslide risk can be eliminated. Permit development in landslide prone areas only when sites can be shown to be stable during adverse
<br />conditions such as saturated soils, ground shaking, and during grading of the site for roads, installation of infrastructure, and creation of
<br />building pads. Engineering studies shall demonstrate that structures in landslide prone areas would sustain no more damage due to slope
<br />instabilities than damage sustained by a similar building in the Pleasanton Planning Area constructed to current CBC standards and
<br />located on soils with a low susceptibility to failure when exposed to moderate ground shaking.
<br />Hazards Mitigated: Landslide, Earthquake
<br />Both 2, 4, 5, 6, 11 City of Pleasanton Community
<br />Development Department,
<br />Engineering Department
<br />None Low
<br />
<br />General Fund,
<br />Staff Time
<br />Ongoing
<br />Action PLE-10—Require fire mitigation measures in new and existing developments that reduce the fire threat to the structure and
<br />occupants. Require development outside the five-minute travel time and in Special Fire Protection Areas to provide effective fire
<br />prevention measures.
<br />Hazards Mitigated: Wildfire
<br />Both 2, 3, 7 Livermore-Pleasanton Fire
<br />Department
<br />City of Pleasanton Medium
<br />
<br />General Fund,
<br />Private
<br />Development
<br />Investment
<br />Ongoing
<br />Action PLE-11—Provide information to the community about natural hazards, their impacts, and measures both the city and community
<br />members may take to mitigate the impacts. Outreach may include notices on the city website, social media channels, print media, and
<br />other forms of education and awareness.
<br />Hazards Mitigated: Earthquake, Wildfire, Severe Weather, Landslide, Dam Failure, Flood, Drought
<br />Both 1, 3, 7, 9 City of Pleasanton Public
<br />Information Officer with
<br />department wide input
<br />Livermore-
<br />Pleasanton Fire
<br />Department
<br />Low
<br />
<br />General Funds Ongoing
<br />Action PLE-12—Substantial Damage Response/Management Plan—Explore the feasibility of developing the plan. Develop the plan if
<br />deemed feasible.
<br />Hazards Mitigated: Severe Weather, Flood
<br />Both 1, 4, 5, 6, 8, 10 Engineering Department None Low
<br />
<br />General Funds,
<br />California
<br />Adaptation Grant
<br />Program
<br />Short-term
<br />Action PLE-13—Encourage replacing aboveground electric and phone wires and other structures with underground facilities and use the
<br />planning-approval process to ensure that, on a case-by-case basis, all new phone and electrical lines are installed underground.
<br />Hazards Mitigated: Severe Weather, Landslide, Dam Failure, Flood, Wildfire
<br />Both 4, 8 Engineering Department City of Pleasanton
<br />Community
<br />Development
<br />Department
<br />Low
<br />
<br />General Funds,
<br />Possible PG&E
<br />Underground Fund
<br />Ongoing
<br />Action PLE-14— Explore the feasibility of identifying socially vulnerable populations at the census block level. If deemed feasible,
<br />develop the dataset for future planning efforts.
<br />Hazards Mitigated: Dam Failure, Drought, Earthquake, Flood, Landslide, Severe Weather, Wildfire
<br />Both 1, 9, 10, 12 City of Pleasanton Community
<br />Development Department
<br /> Low
<br />
<br />General Funds,
<br />Staff Time
<br />Short-term
<br />a. Short-term = Completion within 5 years; Long-term = Completion within 10 years; Ongoing= Continuing new or existing program with
<br />no completion date
<br />Acronyms used here are defined at the beginning of this volume.
<br />
<br />Page 124 of 228
|