My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
031924
>
CITY COUNCIL AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2024 2:26:47 PM
Creation date
3/19/2024 2:24:09 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/19/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 7 of 9 <br /> <br />Figure 3: Historical Pavement Expenditures versus PCI <br /> <br /> <br /> <br /> <br />The 2021 PMP projected that with the 2021 budget the network would maintain a PCI of 79 <br />with an increased backlog of $23 million at the end of 2025. There are several reasons why <br />the network is not performing as previously projected, and costs are expected to increase. <br /> <br />1. Construction costs have significantly increased. Since the pandemic, construction costs <br />have risen higher than inflation due to an increase in both materials and labor, which means <br />that the City's network only received approximately 80 percent of planned treatments. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Page 166 of 228