Laserfiche WebLink
<br /> <br />Page | 16 <br /> <br />Pavement Management Technical Assistance (P-TAP) Round 24 <br />Pavement Condition Index (PCI) <br /> <br />After the 2023 pavement management update and recent pavement projects, the City’s overall <br />network PCI is 77 PCI. The overall network condition is a weighted average PCI equal to each <br />management section PCI multiplied by its area and divided by the network's total area. <br />Figure 5 is a street-by-street map of the Pavement Condition Index. <br />Figure 5. Street-by-Street Map of Pavement Condition Index (2023) <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Current Condition Categories <br />Condition I - Good to Excellent (PCI 70 - 100) <br />Condition II/III - At Risk to Fair (PCI 50 - 69) <br />Condition IV - Poor (PCI 25 - 49) <br />Condition V - Failed to Very Poor (PCI 0 - 24) <br />Page 184 of 228