My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
031924
>
CITY COUNCIL AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2024 2:26:47 PM
Creation date
3/19/2024 2:24:09 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/19/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Page | 22 <br /> <br />Pavement Management Technical Assistance (P-TAP) Round 24 <br />Full-Depth-Reclamation (FDR)12 – Deep Rehabilitation <br />FDR is a cost-effective, long-lasting, greener alternative to deep rehabilitation or removal and <br />replacement techniques. Full Depth Reclamation (FDR) is an engineered rehabilitation technique. The <br />entire thickness of the asphalt pavement and a predetermined portion of the underlying materials <br />(base, subbase, and subgrade) is uniformly pulverized and blended to provide an upgraded, <br />homogeneous material. The reclaimed materials may be improved and strengthened by using <br />Mechanical, Chemical, or Bituminous stabilization. FDR isn't only for roads in poor condition; it is also <br />a viable design process for increasing pavement's structural capacity in good condition but requires a <br />lot of upfront coordination with various utility agencies to ensure that there are no utility facilities <br />within the existing asphalt and underlying materials that will be pulverized. <br /> <br />Reconstruction <br />Pavement reconstruction is a treatment that is needed when a road has reached the end of its design <br />life, or the pavement has severe cross-section deficiencies due to traffic or environmental factors. <br />These roads typically have a PCI of 25 and below; reconstruction is required to restore the service life. <br />Reconstruction is equivalent to a new pavement that involves rebuilding the pavement layers from the <br />ground up to replace the pavement. This treatment is the most expensive compared to the other <br />treatments in the maintenance strategy. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />12 https://roadresource.org/treatment_resources/full_depth_reclamation <br />Page 190 of 228
The URL can be used to link to this page
Your browser does not support the video tag.