Laserfiche WebLink
<br /> <br />Page | 28 <br /> <br />Pavement Management Technical Assistance (P-TAP) Round 24 <br />Approximately 71.2% (Table 7) of City streets will have a PCI equal to or greater than 70 PCI at the <br />end of 2028 (Condition Category I). <br />Table 7. Scenario 1. Current Budget - 2028 Condition Category Summary <br /> <br />Scenario 1. <br />Current <br />Budget <br />% Change <br />at the end <br />of 5 years <br />% 'Good' in 5 years 71.2 -0.3 <br />% 'Fair' in 5 years 16.3 -6.7 <br />% 'Poor' in 5 years 11.3 5.9 <br />% 'Very Poor' in 5 years 1.2 1.1 <br /> <br />Figure 9 is a projected PCI map for 2028 if the “Current Budget” is implemented. <br />Figure 9. Scenario 1. Current Budget PCI Map - 2028 Condition Category Summary <br /> <br />Current Condition Categories <br />Condition I - Good to Excellent (PCI 70 - 100) <br />Condition II/III - At Risk to Fair (PCI 50 - 69) <br />Condition IV - Poor (PCI 25 - 49) <br />Condition V - Failed to Very Poor (PCI 0 - 24) <br />Page 196 of 228