Laserfiche WebLink
<br /> <br />Page | 30 <br /> <br />Pavement Management Technical Assistance (P-TAP) Round 24 <br />Approximately 75.2% (Table 9) of City streets will have a PCI equal to or greater than 70 PCI at the <br />end of 2028 (Condition Category I). <br />Table 9. Scenario 2. Constant PCI - 2028 Condition Category Summary <br /> <br />Scenario 2. <br />Constant <br />PCI <br />% Change <br />at the end <br />of 5 years <br />% 'Good' in 5 years 75.2 3.7 <br />% 'Fair' in 5 years 14.9 -8.1 <br />% 'Poor' in 5 years 9 3.6 <br />% 'Very Poor' in 5 years 0.9 0.8 <br /> <br />Figure 11 is a projected PCI map 2028 if the “Constant PCI” scenario is implemented. <br />Figure 11. Scenario 2. Constant PCI Map - 2028 Condition Category Summary <br /> <br /> <br />Current Condition Categories <br />Condition I - Good to Excellent (PCI 70 - 100) <br />Condition II/III - At Risk to Fair (PCI 50 - 69) <br />Condition IV - Poor (PCI 25 - 49) <br />Condition V - Failed to Very Poor (PCI 0 - 24) <br />Page 198 of 228