Laserfiche WebLink
<br /> <br />Page | 32 <br /> <br />Pavement Management Technical Assistance (P-TAP) Round 24 <br />Approximately 88.9% (Table 11) of City streets will have a PCI equal to or greater than 70 PCI at the <br />end of 2028 (Condition Category I). <br />Table 11. Scenario 3. Plus 5 PCI Increase - 2028 Condition Category Summary <br /> <br />Scenario 3. <br />Plus 5 PCI <br />Increase <br />% Change <br />at the end <br />of 5 years <br />% 'Good' in 5 years 88.9 17.4 <br />% 'Fair' in 5 years 4.3 -18.7 <br />% 'Poor' in 5 years 5.8 0.4 <br />% 'Very Poor' in 5 years 1 0.9 <br /> <br />Figure 13 shows a projected PCI map for 2028 if the “Plus 5 PCI Increase” scenario is implemented. <br />Figure 13. Scenario 3. Plus 5 PCI Increase PCI Map - 2028 Condition Category Summary <br /> <br />Current Condition Categories <br />Condition I - Good to Excellent (PCI 70 - 100) <br />Condition II/III - At Risk to Fair (PCI 50 - 69) <br />Condition IV - Poor (PCI 25 - 49) <br />Condition V - Failed to Very Poor (PCI 0 - 24) <br />Page 200 of 228