Laserfiche WebLink
<br /> <br />Page | 34 <br /> <br />Pavement Management Technical Assistance (P-TAP) Round 24 <br />Approximately 98.5% (Table 13) of City streets will have a PCI equal to or greater than 70 PCI at the <br />end of 2028 (Condition Category I). <br />Table 13. Scenario 4. Unconstrained Funding - 2028 Condition Category Summary <br /> <br />Scenario 4. <br />Unconstrained <br />Funding <br />% Change <br />at the end <br />of 5 years <br />% 'Good' in 5 years 98.5 27.0 <br />% 'Fair' in 5 years 0.9 -22.1 <br />% 'Poor' in 5 years 0.4 -5.0 <br />% 'Very Poor' in 5 years 0.2 0.1 <br /> <br />Figure 15 is a projected PCI map for 2028 if the “Unconstrained Funding” scenario is implemented. <br />Figure 15. Scenario 4. Unconstrained Funding Map - 2028 Condition Category Summary <br /> <br />Current Condition Categories <br />Condition I - Good to Excellent (PCI 70 - 100) <br />Condition II/III - At Risk to Fair (PCI 50 - 69) <br />Condition IV - Poor (PCI 25 - 49) <br />Condition V - Failed to Very Poor (PCI 0 - 24) <br />Page 202 of 228