201 22781 Design of Aquatic Center 50-Meter Pool Deck 249,000 249,000 6,635,680 Defer Design not started; additional funding needed. 50-meter pool plaster is starting to fail and pool deck is <br />failing with temporary repairs completed in 2023 and major pool equipment past replacement cycle <br />201 23492 <br />Design of the Civic Center Roofing & HVAC <br />Repair 207,500 207,500 6,843,180 Defer Funding for the design of roof replacement for 157 Main Street to address the leaking roof <br />201 23494 Design of City Administration Building 249,000 249,000 7,092,180 Defer <br />Funding for the design of the HVAC and roof replacement for 123 Main Street. The existing HVAC is no <br />longer commercially available and requires custom parts to repair which can shut down the building. The <br />roof is past the scheduled replacement schedule <br />211 17556 <br />Westbound Bernal Avenue at First Street/Sunol <br />Boulevard Intersection Improvements 1,120,776 1,120,776 8,212,956 Defer <br /> Funding for street and sidewalk improvements beyond TIF scope. Due to potential future development, <br />project is recommended to be deferred. Sunol Boulevard will need pavement work following water <br />projects <br />201 17753 Century House Facility Assessment 4,643,500 4,000,000 12,212,956 Defer $643,500 reserved for installation of roof and new gutters and work to stabilize the house <br />201 24461 Climate Action Plan Implementation 1,000,000 1,000,000 13,212,956 Defer Planning phase work for fleet needs at Public Works and Civic Center campuses <br />201 20774 Ken Mercer Skatepark 5,718,381 5,718,381 18,931,337 Defer Design completed; project currently out to bid but not yet awarded <br />CIP Reserves Recommended to be Carried Foward <br />201 06418 CIPR - Capital Improvement Program Reserve 1,220,700 1,220,700 Reserve Reserve Fund utilized to address variability in project bids and emergency projects <br />221 01737 General Trail Improvement and Development 91,747 91,747 Reserve Reserve Fund utilized to address variability in project bids and emergency projects <br />Safety Projects Recommended being Carrried Foward <br />201 23457 OSC Fire Alarm and Notification System 800,000 800,000 Carry <br />Forward <br /> Essential project to replace non-function and non-code compliant fire alarm system at 3333 Busch Road <br />that parts are not available to repair <br />201 22482 Police Department Training Facility 31,305 31,305 Carry <br />Forward Essential project to reopen police training facility. Majority of funding from Facility Impact Fees <br />201 16437 ADA Transition Plan 120,000 120,000 Carry <br />Forward <br /> Essential project to update the ADA Transition Plan, are required to be eligible for Federal and State <br />funding <br />201 22416 2022 Soundwall Repair & Replacement 190,242 190,242 Carry <br />Forward Funding to be used toward stabilization of Valley Avenue Sound Wall, CIP 18437 <br />201 23416 2023 Soundwall Repair & Replacement 100,000 100,000 Carry <br />Forward Funding to be used toward stabilization of Valley Avenue Sound Wall, CIP 18437 <br />201 24416 Annual Soundwall Repair & Replacement 125,000 125,000 Carry <br />Forward Funding to be used toward stabilization of Valley Avenue Sound Wall, CIP 18437 <br />201 18437 Valley Ave Soundwall Replacement 987,140 987,140 Carry <br />Forward <br /> Essential project to install stabilization posts to support the existing wall between Hopyard Road and <br />Santa Rita Road <br />211 11514 <br />West Las Positas Boulevard Multimodal <br />Reconstruction 912,397 912,397 Carry <br />Forward <br /> Essential project to reconstruct failed roadway between Hopyard Road and Stoneridge Drive and utilize <br />grant funding for multimodal components <br />201 11514 <br />West Las Positas Boulevard Multimodal <br />Reconstruction 2,500,000 2,500,000 Carry <br />Forward <br /> Essential project to reconstruct failed roadway between Hopyard Road and Stoneridge Drive and utilize <br />grant funding for multimodal components <br />441 23415 2023 Storm Repair & Replacement 305,678 305,678 Carry <br />Forward Essential project to design the Puri Court storm drain improvements <br />441 22484 <br />Design and Construct Storm Drain <br />Improvements 785,457 785,457 Carry <br />Forward Essential funding for local share of FEMA projects. <br />441 24415 Annual (2024) Storm Repair/Replacement 110,215 110,215 Carry <br />Forward Funding is being utilized to pay for incoming invoices for Santos Ranch culvert repairs <br />441 24662 Sycamore Creek Storm Drain Improvements 200,000 200,000 Carry <br />Forward Essential project to fund the scoping phase, including hydraulic analysis <br />Restricted Reserves to be Carried Foward <br />211 98590 Use of Dublin Fwy Reimbursement 2,108,462 - Carry <br />Forward <br />Funding received for the construction of various freeway interchanges on I-580 that the City advanced. El <br />Charro & I-580 Interchange Improvements under design by City of Dublin. City has an obligation to cover <br />improvements in the southwest quadrant <br />211 02523 Dougherty Valley Mitigation Reserve 377,694 - Carry <br />Forward Traffic mitigation funding from developments in the City of Dublin <br />Projects Under Construction to be Carried Foward <br />Page 227 of 228