|
3
<br />Contract Code section 1102, in which case District shall provide whatever
<br />notice is reasonable under the circumstances.
<br />
<br />c) Access: District shall provide direction to District’s contractors,
<br />consultants, and employees to maintain egress and ingress into the Licensed
<br />Area for the public to the greatest extent possible during Fence Work
<br />construction.
<br />
<br />d) Permits and Approvals: The District, at no expense to the City, shall obtain
<br />any and all required approvals, permits, inspections, or similar items, if any,
<br />from all agencies or authorities with jurisdiction, including right-of-way
<br />certifications and environmental clearances, compliance under the
<br />California Environmental Quality Act (CEQA), and approvals from the
<br />Division of the State Architect (DSA).
<br />
<br />e) Safety Measures: According to generally accepted construction practices,
<br />the District will be solely and completely responsible for conditions for the
<br />Fence Work area, including the furnishing and placing of proper guards for
<br />the prevention of accidents and any other necessary measures required to
<br />secure safety of life or property, particularly when children are present.
<br />This requirement will apply continuously and not be limited to normal
<br />working hours. Implementation and maintenance of safety programs shall
<br />be the sole responsibility of the District.
<br />
<br />f) City’s Non-Responsibility: The District shall pay, when due, all claims for
<br />labor and material furnished to the work site.
<br />
<br />g) Compliance with Law: Contractors retained by the District shall be fully
<br />licensed, registered, and bonded as required by law, and must maintain the
<br />levels of casualty, liability, and workers’ compensation insurance, as well
<br />as performance and payment bonds consistent with law. District shall
<br />ensure that the Fence Work is performed in a sound and workmanlike
<br />manner, in compliance with all laws, ordinances, and regulations applicable
<br />to the work, including, but not limited to, applicable building codes and
<br />regulations, prevailing wage, and other labor and public works laws.
<br />
<br />h) Verification of Measurements and Conditions: District shall be solely and
<br />fully responsible for damage done during the Fence Work to existing
<br />structures, furnishings, equipment, buildings, walks, roads, trees,
<br />landscaping, and/or improvements. District is responsible for verifying all
<br />measurements and existing conditions, including, but not limited to, the
<br />location of any underground utilities, conduits, pipes, or similar
<br />improvements in and around the work sites prior to the start of any work.
<br />If District's failure to properly verify measurements results in any damage,
<br />harm, or impairment to existing conditions (e.g., underground utilities,
<br />Page 68 of 228
|