My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
031924
>
CITY COUNCIL AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2024 2:26:47 PM
Creation date
3/19/2024 2:24:09 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/19/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 6 of 6 <br />in Our Environment, Strategy 1 – Implement the Four Year Capital Improvement Program <br />(CIP) to complete the design and construction of budgeted capital projects and Strategy 3 – <br />Identifying funding and implement the recommendations from the Water Supply Alternative <br />Study to resolve PFAS water quality issues. <br /> <br />FISCAL IMPACT <br />A total of $986,487 is currently budgeted in two CIP projects, the Sunol Boulevard 20-Inch Water Main <br />Project (CIP No. 24173) and the Turnout 4 Replacement and Booster Station and Stoneridge Drive 24-Inch <br />Potable Water Main (CIP No. 24171), for the design phase. Staff recommends consolidating these two <br />projects into CIP No. 24171 and renaming as the Near-Term Water Improvements <br />Project. The anticipated total expenditure for this project is $10,641,025, including a project contingency of <br />$1,280,000 (approximately 15 percent of the bid amount and $100,000 for Zone 7). The contingency is for <br />unanticipated costs that may become apparent during the construction phase and Zone 7 cathodic <br />protection work. The budget includes advertising costs, $35,000 for City furnished material, $22,500 for the <br />replacement of traffic signal loop detectors, $110,000 for consultant design and construction <br />support services, $62,400 for rental of temporary pumps, $330,000 for resident engineering services and <br />$50,000 for material testing services under existing on-call contracts. <br /> <br />The anticipated total expenditure of $10,641,025 leaves a project shortfall of $9,554,538. A reimbursement <br />resolution was approved by the City Council on March 5, 202, that will allow for the expenditures associated <br />with this project to be reimbursed at a later date once bond proceeds become available. Staff estimates that <br />approximately $5.0 million will be spent through July 2024 and recommends utilizing funds from the Water <br />Operating Fund (Fund 420) to cover these costs. Funds will be transferred back to the Water Operating <br />Fund once the proceeds are available from an anticipated bond sale in early June 2024. Additionally, <br />$100,000 for work associated with installing cathodic protection test stations will be reimbursed by Zone <br />7. The funding and anticipated project expenditures are detailed in Attachment 2. <br /> <br />Prepared by: Submitted by: Approved by: <br /> <br />Adam Nelkie, Acting <br />Director, Public Works <br />Adam Nelkie, Acting Director, Public <br />Works <br /> <br />Gerry Beaudin, City <br />Manager <br /> <br />Attachments: <br />1. Bid Summary <br />2. Financial Expenditure Summary <br />3. Location Map <br />4. Professional Services Agreement with Woodard & Curran <br /> <br />Page 97 of 228
The URL can be used to link to this page
Your browser does not support the video tag.