My WebLink
|
Help
|
About
|
Sign Out
AGENDA FULL PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2024
>
03-13
>
AGENDA FULL PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2024 3:32:35 PM
Creation date
5/20/2024 3:23:03 PM
Metadata
Fields
Template:
CITY CLERK
DOCUMENT DATE
3/13/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HCM Signalized Intersection Capacity Analysis Timing Plan: AM PEAK <br />2: Hopyard Rd & S Valley Trails Dr/Parkside Dr 10/17/2023 <br />3200 Hopyard Rd: Existing AM Synchro 11 Report <br />Page 2 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Volume (vph) 65 2 52 34 3 74 30 1060 32 52 1253 53 <br />Future Volume (vph) 65 2 52 34 3 74 30 1060 32 52 1253 53 <br />Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 <br />Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 <br />Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 0.91 1.00 1.00 0.91 1.00 <br />Frpb, ped/bikes 1.00 0.98 1.00 1.00 1.00 1.00 1.00 0.99 1.00 1.00 0.96 <br />Flpb, ped/bikes 1.00 1.00 0.99 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Frt 1.00 0.86 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 <br />Flt Protected 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 <br />Satd. Flow (prot) 1770 1559 1761 1863 1583 1770 5085 1564 1770 5085 1524 <br />Flt Permitted 0.76 1.00 0.72 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 <br />Satd. Flow (perm) 1408 1559 1334 1863 1583 1770 5085 1564 1770 5085 1524 <br />Peak-hour factor, PHF 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 <br />Adj. Flow (vph) 69 2 55 36 3 79 32 1128 34 55 1333 56 <br />RTOR Reduction (vph) 0 50 00000000018 <br />Lane Group Flow (vph) 69 7 0 36 3 79 32 1128 34 55 1333 38 <br />Confl. Peds. (#/hr) 7 7 1 5 <br />Confl. Bikes (#/hr) 1 1 4 <br />Turn Type pm+pt NA pm+pt NA Free Prot NA Free Prot NA Perm <br />Protected Phases 3 8 7 4 5 2 1 6 <br />Permitted Phases 8 4 Free Free 6 <br />Actuated Green, G (s) 20.4 10.1 13.0 6.4 120.0 4.7 77.2 120.0 8.0 80.5 80.5 <br />Effective Green, g (s) 20.4 10.9 13.0 7.2 120.0 4.7 78.5 120.0 8.0 81.8 81.8 <br />Actuated g/C Ratio 0.17 0.09 0.11 0.06 1.00 0.04 0.65 1.00 0.07 0.68 0.68 <br />Clearance Time (s) 4.0 4.8 4.0 4.8 4.0 5.3 4.0 5.3 5.3 <br />Vehicle Extension (s) 2.5 2.0 3.0 2.0 2.0 2.5 3.0 2.5 2.5 <br />Lane Grp Cap (vph) 270 141 168 111 1583 69 3326 1564 118 3466 1038 <br />v/s Ratio Prot c0.02 0.00 0.01 0.00 0.02 0.22 c0.03 c0.26 <br />v/s Ratio Perm c0.02 0.01 0.05 0.02 0.03 <br />v/c Ratio 0.26 0.05 0.21 0.03 0.05 0.46 0.34 0.02 0.47 0.38 0.04 <br />Uniform Delay, d1 43.5 49.8 49.0 53.1 0.0 56.4 9.2 0.0 53.9 8.2 6.2 <br />Progression Factor 1.00 1.00 1.00 1.00 1.00 1.04 0.63 1.00 1.00 0.89 2.29 <br />Incremental Delay, d2 0.4 0.1 0.6 0.0 0.1 1.7 0.3 0.0 2.7 0.3 0.1 <br />Delay (s) 43.8 49.9 49.7 53.1 0.1 60.4 6.0 0.0 56.7 7.6 14.3 <br />Level of Service D D D D AEAAEAB <br />Approach Delay (s) 46.6 16.5 7.3 9.8 <br />Approach LOS D B A A <br />Intersection Summary <br />HCM 2000 Control Delay 10.6 HCM 2000 Level of Service B <br />HCM 2000 Volume to Capacity ratio 0.38 <br />Actuated Cycle Length (s) 120.0 Sum of lost time (s) 16.0 <br />Intersection Capacity Utilization 52.1% ICU Level of Service A <br />Analysis Period (min) 15 <br />c Critical Lane Group
The URL can be used to link to this page
Your browser does not support the video tag.