My WebLink
|
Help
|
About
|
Sign Out
AGENDA FULL PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2024
>
03-13
>
AGENDA FULL PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2024 3:32:35 PM
Creation date
5/20/2024 3:23:03 PM
Metadata
Fields
Template:
CITY CLERK
DOCUMENT DATE
3/13/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HCM Signalized Intersection Capacity Analysis Timing Plan: PM PEAK <br />2: Hopyard Rd & S Valley Trails Dr/Parkside Dr 10/17/2023 <br />3200 Hopyard Rd: Existing PM Synchro 11 Report <br />Page 2 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Volume (vph) 42 7 53 88 3 86 60 1185 206 164 1300 65 <br />Future Volume (vph) 42 7 53 88 3 86 60 1185 206 164 1300 65 <br />Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 <br />Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 <br />Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 0.91 1.00 1.00 0.91 1.00 <br />Frpb, ped/bikes 1.00 1.00 1.00 1.00 0.99 1.00 1.00 0.99 1.00 1.00 0.96 <br />Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Frt 1.00 0.87 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 <br />Flt Protected 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 <br />Satd. Flow (prot) 1761 1616 1770 1863 1562 1770 5085 1561 1770 5085 1518 <br />Flt Permitted 0.76 1.00 0.66 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 <br />Satd. Flow (perm) 1401 1616 1230 1863 1562 1770 5085 1561 1770 5085 1518 <br />Peak-hour factor, PHF 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 <br />Adj. Flow (vph) 48 8 60 100 3 98 68 1347 234 186 1477 74 <br />RTOR Reduction (vph) 0 57 00000000029 <br />Lane Group Flow (vph) 48 11 0 100 3 98 68 1347 234 186 1477 45 <br />Confl. Peds. (#/hr) 6 6 4 6 <br />Confl. Bikes (#/hr)44 <br />Turn Type pm+pt NA pm+pt NA Free Prot NA Free Prot NA Perm <br />Protected Phases 3 8 7 4 5 2 1 6 <br />Permitted Phases 8 4 Free Free 6 <br />Actuated Green, G (s) 21.9 5.3 24.1 6.4 120.0 8.0 60.1 120.0 18.8 70.9 70.9 <br />Effective Green, g (s) 21.9 6.1 24.1 7.2 120.0 8.0 61.4 120.0 18.8 72.2 72.2 <br />Actuated g/C Ratio 0.18 0.05 0.20 0.06 1.00 0.07 0.51 1.00 0.16 0.60 0.60 <br />Clearance Time (s) 4.0 4.8 4.0 4.8 4.0 5.3 4.0 5.3 5.3 <br />Vehicle Extension (s) 2.5 2.0 3.0 2.0 2.0 2.5 3.0 2.5 2.5 <br />Lane Grp Cap (vph) 305 82 326 111 1562 118 2601 1561 277 3059 913 <br />v/s Ratio Prot 0.02 0.01 c0.05 0.00 0.04 c0.26 c0.11 0.29 <br />v/s Ratio Perm 0.01 c0.02 0.06 c0.15 0.03 <br />v/c Ratio 0.16 0.13 0.31 0.03 0.06 0.58 0.52 0.15 0.67 0.48 0.05 <br />Uniform Delay, d1 41.5 54.4 41.2 53.1 0.0 54.4 19.5 0.0 47.7 13.4 9.8 <br />Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 0.79 1.00 0.75 0.25 0.18 <br />Incremental Delay, d2 0.2 0.3 0.5 0.0 0.1 3.9 0.7 0.2 6.0 0.5 0.1 <br />Delay (s) 41.7 54.7 41.8 53.1 0.1 58.1 16.2 0.2 41.8 3.8 1.9 <br />Level of Service D D D D AEBADAA <br />Approach Delay (s) 49.3 21.6 15.6 7.8 <br />Approach LOS D C B A <br />Intersection Summary <br />HCM 2000 Control Delay 13.3 HCM 2000 Level of Service B <br />HCM 2000 Volume to Capacity ratio 0.50 <br />Actuated Cycle Length (s) 120.0 Sum of lost time (s) 16.0 <br />Intersection Capacity Utilization 56.3% ICU Level of Service B <br />Analysis Period (min) 15 <br />c Critical Lane Group
The URL can be used to link to this page
Your browser does not support the video tag.