My WebLink
|
Help
|
About
|
Sign Out
AGENDA FULL PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2024
>
03-13
>
AGENDA FULL PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2024 3:32:35 PM
Creation date
5/20/2024 3:23:03 PM
Metadata
Fields
Template:
CITY CLERK
DOCUMENT DATE
3/13/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HCM Signalized Intersection Capacity Analysis Timing Plan: PM PEAK <br />4: Hopyard Rd & W Las Positas Blvd 10/17/2023 <br />3200 Hopyard Rd: Existing PM Synchro 11 Report <br />Page 4 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Volume (vph) 107 234 352 300 207 75 287 725 334 49 937 88 <br />Future Volume (vph) 107 234 352 300 207 75 287 725 334 49 937 88 <br />Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 <br />Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 <br />Lane Util. Factor 0.97 0.95 1.00 0.97 0.95 1.00 0.97 0.91 1.00 0.97 0.91 1.00 <br />Frpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 0.99 1.00 1.00 0.99 1.00 1.00 0.99 <br />Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 <br />Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 <br />Satd. Flow (prot) 3433 3539 1583 3433 3539 1563 3433 5085 1562 3433 5085 1562 <br />Flt Permitted 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 <br />Satd. Flow (perm) 3433 3539 1583 3433 3539 1563 3433 5085 1562 3433 5085 1562 <br />Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 <br />Adj. Flow (vph) 116 254 383 326 225 82 312 788 363 53 1018 96 <br />RTOR Reduction (vph)0000000000055 <br />Lane Group Flow (vph) 116 254 383 326 225 82 312 788 363 53 1018 41 <br />Confl. Peds. (#/hr) 2 5 1 <br />Turn Type Prot NA Free Prot NA Free Prot NA Free Prot NA Perm <br />Protected Phases 7 4 3 8 5 2 1 6 <br />Permitted Phases Free Free Free 6 <br />Actuated Green, G (s) 8.4 16.6 120.0 15.1 23.3 120.0 19.8 64.7 120.0 5.4 49.9 49.9 <br />Effective Green, g (s) 8.4 17.5 120.0 15.1 24.2 120.0 19.8 66.0 120.0 5.4 51.6 51.6 <br />Actuated g/C Ratio 0.07 0.15 1.00 0.13 0.20 1.00 0.17 0.55 1.00 0.05 0.43 0.43 <br />Clearance Time (s) 4.0 4.9 4.0 4.9 4.0 5.3 4.0 5.7 5.7 <br />Vehicle Extension (s) 2.0 3.0 2.0 3.0 2.0 3.0 2.0 3.0 3.0 <br />Lane Grp Cap (vph) 240 516 1583 431 713 1563 566 2796 1562 154 2186 671 <br />v/s Ratio Prot 0.03 c0.07 c0.09 0.06 c0.09 0.15 0.02 c0.20 <br />v/s Ratio Perm 0.24 0.05 0.23 0.03 <br />v/c Ratio 0.48 0.49 0.24 0.76 0.32 0.05 0.55 0.28 0.23 0.34 0.47 0.06 <br />Uniform Delay, d1 53.7 47.2 0.0 50.7 40.8 0.0 46.0 14.4 0.0 55.6 24.4 20.0 <br />Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 0.68 0.71 1.00 1.00 1.00 1.00 <br />Incremental Delay, d2 0.6 0.7 0.4 6.6 0.3 0.1 0.6 0.2 0.3 0.5 0.7 0.2 <br />Delay (s) 54.3 47.9 0.4 57.3 41.1 0.1 31.7 10.5 0.3 56.1 25.1 20.2 <br />Level of Service D D A E D A C B A E C C <br />Approach Delay (s) 24.7 44.1 12.5 26.1 <br />Approach LOS C D B C <br />Intersection Summary <br />HCM 2000 Control Delay 23.7 HCM 2000 Level of Service C <br />HCM 2000 Volume to Capacity ratio 0.53 <br />Actuated Cycle Length (s) 120.0 Sum of lost time (s) 16.0 <br />Intersection Capacity Utilization 60.9% ICU Level of Service B <br />Analysis Period (min) 15 <br />c Critical Lane Group
The URL can be used to link to this page
Your browser does not support the video tag.