Laserfiche WebLink
HCM Signalized Intersection Capacity Analysis Timing Plan: PM PEAK <br />2: Hopyard Rd & S Valley Trails Dr/Parkside Dr 10/17/2023 <br />3200 Hopyard Rd: Existing plus Project PM Synchro 11 Report <br />Page 2 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Volume (vph) 47 7 59 88 3 86 73 1185 206 164 1300 76 <br />Future Volume (vph) 47 7 59 88 3 86 73 1185 206 164 1300 76 <br />Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 <br />Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 <br />Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 0.91 1.00 1.00 0.91 1.00 <br />Frpb, ped/bikes 1.00 1.00 1.00 1.00 0.99 1.00 1.00 0.99 1.00 1.00 0.96 <br />Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Frt 1.00 0.87 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 <br />Flt Protected 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 <br />Satd. Flow (prot) 1761 1613 1770 1863 1562 1770 5085 1561 1770 5085 1518 <br />Flt Permitted 0.76 1.00 0.62 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 <br />Satd. Flow (perm) 1401 1613 1164 1863 1562 1770 5085 1561 1770 5085 1518 <br />Peak-hour factor, PHF 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 <br />Adj. Flow (vph) 53 8 67 100 3 98 83 1347 234 186 1477 86 <br />RTOR Reduction (vph) 0 64 00000000035 <br />Lane Group Flow (vph) 53 11 0 100 3 98 83 1347 234 186 1477 51 <br />Confl. Peds. (#/hr) 6 6 4 6 <br />Confl. Bikes (#/hr)44 <br />Turn Type pm+pt NA pm+pt NA Free Prot NA Free Prot NA Perm <br />Protected Phases 3 8 7 4 5 2 1 6 <br />Permitted Phases 8 4 Free Free 6 <br />Actuated Green, G (s) 22.0 5.4 24.0 6.4 120.0 8.8 60.1 120.0 18.8 70.1 70.1 <br />Effective Green, g (s) 22.0 6.2 24.0 7.2 120.0 8.8 61.4 120.0 18.8 71.4 71.4 <br />Actuated g/C Ratio 0.18 0.05 0.20 0.06 1.00 0.07 0.51 1.00 0.16 0.60 0.60 <br />Clearance Time (s) 4.0 4.8 4.0 4.8 4.0 5.3 4.0 5.3 5.3 <br />Vehicle Extension (s) 2.5 2.0 3.0 2.0 2.0 2.5 3.0 2.5 2.5 <br />Lane Grp Cap (vph) 306 83 321 111 1562 129 2601 1561 277 3025 903 <br />v/s Ratio Prot 0.02 0.01 c0.05 0.00 c0.05 c0.26 c0.11 0.29 <br />v/s Ratio Perm 0.01 c0.02 0.06 c0.15 0.03 <br />v/c Ratio 0.17 0.14 0.31 0.03 0.06 0.64 0.52 0.15 0.67 0.49 0.06 <br />Uniform Delay, d1 41.6 54.3 41.6 53.1 0.0 54.1 19.5 0.0 47.7 13.9 10.2 <br />Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 0.79 1.00 0.75 0.26 0.18 <br />Incremental Delay, d2 0.2 0.3 0.6 0.0 0.1 7.5 0.7 0.2 6.0 0.5 0.1 <br />Delay (s) 41.8 54.6 42.1 53.1 0.1 61.7 16.0 0.2 41.7 4.2 1.9 <br />Level of Service D D D D AEBADAA <br />Approach Delay (s) 49.3 21.8 16.1 8.1 <br />Approach LOS D C B A <br />Intersection Summary <br />HCM 2000 Control Delay 13.8 HCM 2000 Level of Service B <br />HCM 2000 Volume to Capacity ratio 0.50 <br />Actuated Cycle Length (s) 120.0 Sum of lost time (s) 16.0 <br />Intersection Capacity Utilization 56.3% ICU Level of Service B <br />Analysis Period (min) 15 <br />c Critical Lane Group