My WebLink
|
Help
|
About
|
Sign Out
AGENDA FULL PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2024
>
03-13
>
AGENDA FULL PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2024 3:32:35 PM
Creation date
5/20/2024 3:23:03 PM
Metadata
Fields
Template:
CITY CLERK
DOCUMENT DATE
3/13/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HCM Signalized Intersection Capacity Analysis Timing Plan: PM PEAK <br />4: Hopyard Rd & W Las Positas Blvd 10/17/2023 <br />3200 Hopyard Rd: Approved PM Synchro 11 Report <br />Page 4 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Volume (vph) 90 220 350 540 320 100 280 890 370 80 1290 70 <br />Future Volume (vph) 90 220 350 540 320 100 280 890 370 80 1290 70 <br />Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 <br />Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 <br />Lane Util. Factor 0.97 0.95 1.00 0.97 0.95 1.00 0.97 0.91 1.00 0.97 0.91 1.00 <br />Frpb, ped/bikes 1.00 1.00 0.99 1.00 1.00 0.98 1.00 1.00 0.99 1.00 1.00 0.98 <br />Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 <br />Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 <br />Satd. Flow (prot) 3433 3539 1563 3433 3539 1557 3433 5085 1561 3433 5085 1554 <br />Flt Permitted 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 <br />Satd. Flow (perm) 3433 3539 1563 3433 3539 1557 3433 5085 1561 3433 5085 1554 <br />Peak-hour factor, PHF 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 <br />Adj. Flow (vph) 97 237 376 581 344 108 301 957 398 86 1387 75 <br />RTOR Reduction (vph)0000000000051 <br />Lane Group Flow (vph) 97 237 376 581 344 108 301 957 398 86 1387 24 <br />Confl. Peds. (#/hr) 2 10 5 3 <br />Confl. Bikes (#/hr) 7 2 4 <br />Turn Type Prot NA Free Prot NA Free Prot NA Free Prot NA Perm <br />Protected Phases 7 4 3 8 5 2 1 6 <br />Permitted Phases Free Free Free 6 <br />Actuated Green, G (s) 7.8 16.2 120.0 28.6 37.0 120.0 19.9 50.6 120.0 6.4 36.7 36.7 <br />Effective Green, g (s) 7.8 17.1 120.0 28.6 37.9 120.0 19.9 51.9 120.0 6.4 38.4 38.4 <br />Actuated g/C Ratio 0.06 0.14 1.00 0.24 0.32 1.00 0.17 0.43 1.00 0.05 0.32 0.32 <br />Clearance Time (s) 4.0 4.9 4.0 4.9 4.0 5.3 4.0 5.7 5.7 <br />Vehicle Extension (s) 2.0 3.0 2.0 3.0 2.0 3.0 2.0 3.0 3.0 <br />Lane Grp Cap (vph) 223 504 1563 818 1117 1557 569 2199 1561 183 1627 497 <br />v/s Ratio Prot 0.03 c0.07 c0.17 0.10 c0.09 0.19 0.03 c0.27 <br />v/s Ratio Perm 0.24 0.07 0.25 0.02 <br />v/c Ratio 0.43 0.47 0.24 0.71 0.31 0.07 0.53 0.44 0.25 0.47 0.85 0.05 <br />Uniform Delay, d1 54.0 47.3 0.0 41.9 31.1 0.0 45.8 23.8 0.0 55.2 38.2 28.2 <br />Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 0.74 0.62 1.00 1.00 1.00 1.00 <br />Incremental Delay, d2 0.5 0.7 0.4 2.4 0.2 0.1 0.4 0.6 0.4 0.7 5.9 0.2 <br />Delay (s) 54.5 48.0 0.4 44.3 31.3 0.1 34.2 15.4 0.4 55.8 44.0 28.4 <br />Level of Service D D A D C A C B A E D C <br />Approach Delay (s) 23.7 35.4 15.2 43.9 <br />Approach LOS C D B D <br />Intersection Summary <br />HCM 2000 Control Delay 29.6 HCM 2000 Level of Service C <br />HCM 2000 Volume to Capacity ratio 0.69 <br />Actuated Cycle Length (s) 120.0 Sum of lost time (s) 16.0 <br />Intersection Capacity Utilization 69.0% ICU Level of Service C <br />Analysis Period (min) 15 <br />c Critical Lane Group
The URL can be used to link to this page
Your browser does not support the video tag.