My WebLink
|
Help
|
About
|
Sign Out
AGENDA FULL PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2024
>
03-13
>
AGENDA FULL PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2024 3:32:35 PM
Creation date
5/20/2024 3:23:03 PM
Metadata
Fields
Template:
CITY CLERK
DOCUMENT DATE
3/13/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HCM Signalized Intersection Capacity Analysis Timing Plan: PM PEAK <br />3: Hopyard Rd & N Valley Trails Dr/Arthur Dr 10/17/2023 <br />3200 Hopyard Rd: Approved plus Project PM Synchro 11 Report <br />Page 3 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Volume (vph) 150 0 70 10 10 20 60 1345 10 40 2051 160 <br />Future Volume (vph) 150 0 70 10 10 20 60 1345 10 40 2051 160 <br />Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 <br />Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 <br />Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.91 1.00 0.91 1.00 <br />Frpb, ped/bikes 1.00 0.99 1.00 0.98 1.00 1.00 1.00 1.00 0.96 <br />Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Frt 1.00 0.85 1.00 0.85 1.00 1.00 1.00 1.00 0.85 <br />Flt Protected 0.95 1.00 0.98 1.00 0.95 1.00 0.95 1.00 1.00 <br />Satd. Flow (prot) 1770 1562 1817 1550 1770 5078 1770 5085 1520 <br />Flt Permitted 0.74 1.00 0.86 1.00 0.95 1.00 0.95 1.00 1.00 <br />Satd. Flow (perm) 1384 1562 1601 1550 1770 5078 1770 5085 1520 <br />Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 <br />Adj. Flow (vph) 163 0 76 11 11 22 65 1462 11 43 2229 174 <br />RTOR Reduction (vph) 0 0 63 0 0 18 0000025 <br />Lane Group Flow (vph) 0 163 13 0 22 4 65 1473 0 43 2229 149 <br />Confl. Peds. (#/hr)67 <br />Confl. Bikes (#/hr)1774 <br />Turn Type Perm NA Perm Perm NA Perm Prot NA Prot NA Perm <br />Protected Phases 4 4 5 2 1 6 <br />Permitted Phases 4 4 4 4 6 <br />Actuated Green, G (s) 19.6 19.6 19.6 19.6 7.2 80.1 6.4 79.3 79.3 <br />Effective Green, g (s) 20.2 20.2 20.2 20.2 7.2 81.4 6.4 80.6 80.6 <br />Actuated g/C Ratio 0.17 0.17 0.17 0.17 0.06 0.68 0.05 0.67 0.67 <br />Clearance Time (s) 4.6 4.6 4.6 4.6 4.0 5.3 4.0 5.3 5.3 <br />Vehicle Extension (s) 3.0 3.0 3.0 3.0 2.0 3.5 2.0 3.5 3.5 <br />Lane Grp Cap (vph) 232 262 269 260 106 3444 94 3415 1020 <br />v/s Ratio Prot c0.04 0.29 0.02 c0.44 <br />v/s Ratio Perm c0.12 0.01 0.01 0.00 0.10 <br />v/c Ratio 0.70 0.05 0.08 0.01 0.61 0.43 0.46 0.65 0.15 <br />Uniform Delay, d1 47.1 41.8 42.1 41.6 55.0 8.7 55.1 11.5 7.2 <br />Progression Factor 1.00 1.00 1.00 1.00 1.28 0.13 1.32 0.19 0.02 <br />Incremental Delay, d2 9.3 0.1 0.1 0.0 6.7 0.4 0.9 0.7 0.2 <br />Delay (s) 56.3 41.9 42.2 41.6 77.1 1.5 73.6 2.9 0.4 <br />Level of Service E D D D E A E A A <br />Approach Delay (s) 51.7 41.9 4.7 4.0 <br />Approach LOS D D A A <br />Intersection Summary <br />HCM 2000 Control Delay 7.3 HCM 2000 Level of Service A <br />HCM 2000 Volume to Capacity ratio 0.66 <br />Actuated Cycle Length (s) 120.0 Sum of lost time (s) 12.0 <br />Intersection Capacity Utilization 68.8% ICU Level of Service C <br />Analysis Period (min) 15 <br />c Critical Lane Group
The URL can be used to link to this page
Your browser does not support the video tag.