Laserfiche WebLink
HCM Signalized Intersection Capacity Analysis Timing Plan: AM PEAK <br />2: Hopyard Rd & S Valley Trails Dr/Parkside Dr 10/17/2023 <br />3200 Hopyard Rd: Buildout AM Synchro 11 Report <br />Page 2 <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations <br />Traffic Volume (vph) 130 10 70 50 10 50 90 1710 30 40 1500 130 <br />Future Volume (vph) 130 10 70 50 10 50 90 1710 30 40 1500 130 <br />Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 <br />Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 <br />Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 0.91 1.00 1.00 0.91 1.00 <br />Frpb, ped/bikes 1.00 0.98 1.00 1.00 0.99 1.00 1.00 0.99 1.00 1.00 0.97 <br />Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Frt 1.00 0.87 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 <br />Flt Protected 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 <br />Satd. Flow (prot) 1765 1584 1766 1863 1562 1770 5085 1561 1770 5085 1529 <br />Flt Permitted 0.75 1.00 0.57 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 <br />Satd. Flow (perm) 1394 1584 1063 1863 1562 1770 5085 1561 1770 5085 1529 <br />Peak-hour factor, PHF 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 <br />Adj. Flow (vph) 140 11 75 54 11 54 97 1839 32 43 1613 140 <br />RTOR Reduction (vph) 0 67 00000000035 <br />Lane Group Flow (vph) 140 19 0 54 11 54 97 1839 32 43 1613 105 <br />Confl. Peds. (#/hr) 3 4 4 3 4 3 <br />Confl. Bikes (#/hr)4248 <br />Turn Type pm+pt NA pm+pt NA Free Prot NA Free Prot NA Perm <br />Protected Phases 3 8 7 4 5 2 1 6 <br />Permitted Phases 8 4 Free Free 6 <br />Actuated Green, G (s) 23.9 11.5 16.1 7.6 120.0 11.0 74.7 120.0 7.2 70.9 70.9 <br />Effective Green, g (s) 23.9 12.3 16.1 8.4 120.0 11.0 76.0 120.0 7.2 72.2 72.2 <br />Actuated g/C Ratio 0.20 0.10 0.13 0.07 1.00 0.09 0.63 1.00 0.06 0.60 0.60 <br />Clearance Time (s) 4.0 4.8 4.0 4.8 4.0 5.3 4.0 5.3 5.3 <br />Vehicle Extension (s) 2.5 2.0 3.0 2.0 2.0 2.5 3.0 2.5 2.5 <br />Lane Grp Cap (vph) 315 162 192 130 1562 162 3220 1561 106 3059 919 <br />v/s Ratio Prot c0.05 0.01 0.02 0.01 c0.05 c0.36 0.02 0.32 <br />v/s Ratio Perm c0.04 0.02 0.03 0.02 0.07 <br />v/c Ratio 0.44 0.12 0.28 0.08 0.03 0.60 0.57 0.02 0.41 0.53 0.11 <br />Uniform Delay, d1 42.8 48.9 48.2 52.2 0.0 52.4 12.6 0.0 54.3 13.9 10.2 <br />Progression Factor 1.00 1.00 1.00 1.00 1.00 1.24 0.50 1.00 1.03 0.64 0.75 <br />Incremental Delay, d2 0.7 0.1 0.8 0.1 0.0 3.3 0.6 0.0 2.2 0.6 0.2 <br />Delay (s) 43.5 49.0 49.0 52.3 0.0 68.4 7.0 0.0 58.3 9.5 7.8 <br />Level of Service D D D D AEAAEAA <br />Approach Delay (s) 45.6 27.1 9.9 10.5 <br />Approach LOS D C A B <br />Intersection Summary <br />HCM 2000 Control Delay 12.6 HCM 2000 Level of Service B <br />HCM 2000 Volume to Capacity ratio 0.57 <br />Actuated Cycle Length (s) 120.0 Sum of lost time (s) 16.0 <br />Intersection Capacity Utilization 62.7% ICU Level of Service B <br />Analysis Period (min) 15 <br />c Critical Lane Group