My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
0521
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2024 11:11:03 AM
Creation date
5/29/2024 11:03:08 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/21/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
720
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 of 8 <br />capital repair and replacement costs. Annual assessments would need to be increased from <br />$269.62 to about $360-$400 (an increase of about $8-$10 per month per property), and the <br />inclusion of an inflation escalator will be needed. Additionally, $40,000 would be necessary in <br />the future to conduct a Proposition 218-compliant vote. <br /> <br />Landscape Maintenance District 1993-2, Bonde Ranch <br />The Bonde Ranch subdivision (District 1993-2) has been in place for 30 years. Maintenance in <br />this district includes entry features, open space areas, firebreaks, trees, shrubbery, <br />groundcover and irrigation systems for the subdivision known as Tracts 6483 and 6518. The <br />assessments are not enough to fund the maintenance of the district areas to the same level as <br />in past years. This amount will fund the district’s reduced maintenance, county assessment <br />fees, and City administration fees but will not fund capital repair or replacement costs. <br /> <br />This district's fund balance for capital repair and replacement is $25,000. This amount is not <br />enough for the significant improvements for which replacement must be considered in the near <br />term. <br /> <br />Despite shutting off the water due to existing leaks in the irrigation system, the fund balance for <br />Bonde Ranch is insufficient for other basic maintenance tasks such as mulch replacement and <br />more extensive fence repair, replacement, and painting. An increase in the annual assessment <br />will be necessary to continue the maintenance standards of the district and replenish the <br />reserve needed to fund eventual capital repair and replacement costs. In 2022, City staff <br />initiated a discussion about increasing the assessments through a Proposition 218-compliant <br />vote. However, the property owners at the neighborhood outreach meeting expressed strong <br />opposition to increasing the assessment, so staff paused this effort. <br /> <br />Capital improvements, maintenance, electricity, and water costs are projected to continue to <br />increase. Weed management consumes over 40 percent of the LMD budget. To return the <br />district to a similar level of maintenance as was intended when the Bonde Ranch LMD was <br />approved, the annual assessments would need to be increased from $257.22 to about $620- <br />$750 (an increase of about $30-$40 per month per property). The inclusion of an inflation <br />escalator would be sought. Additionally, $40,000 would be needed to conduct a Proposition <br />218-compliant vote. <br /> <br />Landscape Maintenance District 1994-1, Oak Tree Farm <br />The Oak Tree Farm subdivision (District 1994-1) has been in place for 30 years. Maintenance <br />in this district includes open space areas, entry features, decorative lighting, firebreaks, trees, <br />shrubbery, groundcover and irrigation systems. The assessments are not enough to fund the <br />maintenance of the district areas to the same level as in past years This amount is adequate to <br />fund the reduced maintenance of the district, county assessment fees, City administration fees, <br />and minor district improvements, but not enough to cover any required capital replacement <br />costs or additional emergency repair services. City staff continues to work closely with the <br />maintenance contractor to increase the efficiency of landscape maintenance operations and <br />has shut off water due to leaks in the irrigation system. An increase in the annual assessment <br />will be necessary in the future to continue the maintenance standards of past years. <br /> <br />This district's fund balance for capital repair and replacement is $72,000. This amount is not <br />enough for several improvements for which replacement must be considered in the near term. <br />The improvements consist of extensive irrigation system replacement and plant replacement, <br />Page 270 of 720
The URL can be used to link to this page
Your browser does not support the video tag.